BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Lake Mary, Florida. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.

As of April 6, 2023, information regarding the award and award date has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2025. *The closed solicitation has been included below for reference: Project Threshold : Project is greater than or equal to $500,000.00 (Technically Prequalified & Unlimited Audit required) District : 02 Selection Method : Letter of Response and Interview Project Description : SR15 (US17) from Oak Street to Black Creek TRC Members (Subject to Change) : Darrell Locklear Eric Shimer Peter Winkler The goal of the Departments Under-Utilization strategy is to encourage and promote use of Disadvantaged Business Enterprises (DBE) and Small Businesses in areas of work where they have been under-used. Under-Utilization is defined by FDOT as 25% or less utilization level in a Work Group, which may vary by district. The specific Under-Utilized Work Groups are identified in the advertisement. Consultants are strongly encouraged to propose a DBE or Small Business to perform services for each Under-Utilized Work Group identified in the advertisement. The following two projects will be advertised together and four firms will be shortlisted. The top two ranked firms will each receive a contract for one of the projects. 208202-5-32-01: SR15 (US17) from Oak Street to Black Creek. Estimated contract amount is $1,961,315. The project manager is Peter Osborne. 210269-4-32-01: SR5 (US1) from Moultrie Creek Bridge to North of SR 207. Estimated contract amount is $1,111,734. The project manager is Peter Winkler. Shortlist Selection Date/Time 9/26/2022 07:30 pm Technical Review Committee Meeting 1 Date/Time 10/26/2022 12:30 am Consultant Interviews Date/Time 10/26/2022 Final Selection Date/Time 11/07/2022 08:30 pm Negotiations Period Begin Date 11/08/2022 Negotiations Period Ending Date 1/27/2023 The method of contractor selection has not been determined at this time. FDOT - RFP Engineering - SR15 (US17) From Oak Street to Black Creek

Conceptual

Roads / Highways

$16,061,418.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
135
Active Projects
71
Bidding Soon
1,271
All Active Projects
548
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.