BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Merrimack, New Hampshire. Completed plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Phase IA is the installation of storm drainage piping and Pre-cast concrete catch basins including reconstructing the road per plans. Phase IB is to shim and overlay 1 of pavement STA 6+55 to STA 11+ 75. Phase II is to install under drain pipe along the north side of Jay Road to Catch Basin 718. Also to install underdrain on the south side or Jay Road down the west side of Gail Road. Install two new Catch Basins and piping as needed to remove the room ball, as shown on sheet 4 of the plans. The road from Catch Basin 716 to Joey Road shall be hot bituminous pavement (2 base course + 1 wearing course), loam & seed. Maintenance of traffic and other incidental construction items shall apply throughout the project. The Owner reserves the right to waive any informalities in any or all proposals, to reject any or all proposals, or accept any proposal submitted for the project, as deemed by the Town of Merrimack to be in its best interests based upon qualifications, experience, demonstrated ability to perform, cost and other factors deemed by the Town to bear on the successful outcome of the Contract.

Post-Bid

Water / Sewer

$600,000.00

Public - City

Paving, Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
489
Active Projects
219
Bidding Soon
3,628
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

July 21, 2022

Project location map

Multiple Locations, Merrimack, NH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.