BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in San Antonio, Texas. Completed plans call for site work for a road / highway; and for paving for a road / highway.

As of September 29, 2022, the project has been awarded. A timeline for construction has not been confirmed. The Deadline for questions is scheduled for July 6, 2022 at 4:00 P.M. CST. It is understood and agreed that the work is to be substantially completed on or before 365 calendar days. This project does not include hazardous environmental work. This project requires 0 project signs per task order. The City of San Antonio point of contact for this solicitation is Melissa Ortega. Questions are to be submitted in writing in the Questions and Answers section electronically The following documents constitute the required information to be submitted as a part of the bid proposal and are required uploads Contract Signature Page Subcontractor/Supplier Commitment Form Bid Bond Form 1295 with Certification Number & Date Filed Project construction may include but is not limited to: asphalt milling and overlay, seal coat, base and pavement replacement, cleaning and sealing joints and cracks, curb ramps, concrete curbs, sidewalks, driveways, concrete retaining walls-combination type, speed humps, topsoil, sodding, signage, pavement markings installation, adjusting existing valve boxes, meter boxes and manholes, and any other items required due to the site conditions to accomplish the project scope. This task order construction contract start shall begin within thirty (30) calendar days of the executed contract or issuance of the first task order, whichever comes first. The contract shall be terminated three hundred and sixty-five (365) calendar days from the start of the contract. The construction time (in calendar days) for each individual site will be negotiated between the City Engineer or Project Manager and the Contractor. The Contractor may also be limited to the amount of individual project sites open at any given time based on performance or available resources. Liquidated damages for construction time will be assessed on a per site basis should the Contractor fail to complete the construction in the specified calendar days as negotiated by the City Engineer or Project Manager. The Contractor shall refer to section 4.2.6 of the general conditions for claims for additional contract time due to inclement weather.

Award

Roads / Highways

$8,969,238.00

Public - State/Provincial

Paving, Site Work

64

13

2

5

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
59
Active Projects
25
Bidding Soon
1,953
All Active Projects
762
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.