BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Foster City, California. Completed plans call for site work for a water / sewer project.

This project will improve water supply reliability and redundancy and minimize water service interruptions in a catastrophic seismic event. The District's 24-inch water transmission main pipeline is the sole source of potable water for the City and is attached to the Seal Slough Bridge. Seal Slough Bridge was built in the 1930's and is used as a pedway only. The bridge is aging and could fail in the event of an earthquake and with it, the District would lose its primary water supply. As part of CIP 636-Water System Improvements and Valve Replacements Project, two 12-inch emergency water bypass connections, with isolation valves and fittings were constructed on the transmission main beyond the ends of the bridge to provide a means of restoring water service quickly in the event of the bridge and pipeline failure. The project includes the purchase of 1,250 feet of 12-inch temporary bypass piping that would be stored at the District's Corporation Yard and assembled by staff quickly (within 1-2 days) in an emergency to restore flow until the transmission main could be repaired. This project is a continuation of CIP 636, as it provides for the construction of a permanent bypass pipe to be attached to the adjacent bridge on East Third Avenue and joined at the second bypass connection that was constructed as part of CIP 636. The permanent bypass pipe would provide a redundant water supply immediately and increase efficiency and speed of response during an emergency. This Project Is included in the City of Foster City's FY 2022 - 2023 Capital Improvement Plan (CIP). Per the owner, as of May 25, 2023, this project has been completed. Information regarding a design team or a general contractor has not been disclosed by the owner. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Occupancy

Water / Sewer

$300,000.00

Public - City

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
86
Bidding Soon
1,746
All Active Projects
728
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 24, 2023

img_map_placeholder

E 3rd Ave, Foster City, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.