BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 28, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a multi-residential development in Arvada, Colorado. Completed plans call for the renovation of a multi-residential development.

Design and install solar production system(s) to be placed on roof top sections of the new construction site known as Allison Village LLLP at 5354 Allison St, Arvada CO 80002 for energy enhancement of the same facility. The project is new construction with an expected opening & CO date of approximately October 15, 2022. FRH is requiring completion of the solar installation by September 16, 2022. Question Acceptance Deadline 06/27/2022 02:00 AM EDT Questions are submitted online No Piggyback Contract No General Requirements - Insurance Required - Local Service Required - Contractors License Required - Warranty Information Required - Installation Required - License Required

Post-Bid

Multi-Residential

$400,000.00

Public - County

Renovation

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
82
Bidding Soon
1,336
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 30, 2022

August 1, 2022

Project location map

5354 Allison St, Arvada, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.