Site work and paving for a road / highway in Wittenberg, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of October 6, 2022, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *The closed solicitation has been included below for reference: Perpetuation project of 24.0 centerline miles (total for EB and WB) STH 29 to repair joints and thin mill and overlay shoulders and intersection from CTH M in the Town of Belle Plaine to South Highline Road in the Town of Hartland in Shawano County. Mill and overlay the park and ride located off STH 117, and 8 culvert pipes (8203, 8214/8215, 8235, 8252, 8256, 8257, 8262, 8282) will be replaced or repaired, all delineators will be replaced or removed, all guardrail will be evaluated/replaced and automatic traffic recorder impacts reviewed. Anticipated Construction Cost: $14,000,000-$14,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found at http://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rgistr/fncl-rpt.aspx. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. The method of contractor selection has not been determined at this time. Wis DOT - NC-04 - RFP Engineering - Perpetuation - Resurfacing - STH 29

Design

Roads / Highways

$15,000,000.00

Public - State/Provincial

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
19
Bidding Soon
297
All Active Projects
126
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

img_map_placeholder

WI-29 Trunk, Wittenberg, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.