Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published October 6, 2022 at 8:00 PM
Updated September 15, 2023
Site work and paving for a road / highway in Wittenberg, Wisconsin. Design plans call for site work for a road / highway; and for paving for a road / highway.
As of October 6, 2022, an engineer has been selected and this project is in the design phase. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *The closed solicitation has been included below for reference: Perpetuation project of 24.0 centerline miles (total for EB and WB) STH 29 to repair joints and thin mill and overlay shoulders and intersection from CTH M in the Town of Belle Plaine to South Highline Road in the Town of Hartland in Shawano County. Mill and overlay the park and ride located off STH 117, and 8 culvert pipes (8203, 8214/8215, 8235, 8252, 8256, 8257, 8262, 8282) will be replaced or repaired, all delineators will be replaced or removed, all guardrail will be evaluated/replaced and automatic traffic recorder impacts reviewed. Anticipated Construction Cost: $14,000,000-$14,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Information on the report may be found at http://wisconsindot.gov/Pages/doing-bus/eng-consultants/cnslt-rgistr/fncl-rpt.aspx. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. The method of contractor selection has not been determined at this time. Wis DOT - NC-04 - RFP Engineering - Perpetuation - Resurfacing - STH 29
Design
Roads / Highways
$15,000,000.00
Public - State/Provincial
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 20, 2023
WI-29 Trunk, Wittenberg, WI
Related To This Project
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
