BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work and renovation of a water / sewer project in Oakland, California. Working plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Notice is hereby given that the East Bay Municipal Utility District (hereinafter referred to as the "District") has determined that all Electrical Contractors sub-bidding on the Specification 2128 - UPPER SAN LEANDRO WATER TREATMENT PLANT MAINTENANCE AND RELIABILITY, AND UPPER SAN LEANDRO AND SOBRANTE WATER TREATMENT PLANTS CHEMICAL SYSTEMS SAFETY IMPROVEMENTS ("Project") shall be prequalified prior to submitting a sub-bid on the Project. It is mandatory that all Electrical Contractors who intend to submit a sub-bid for the Project ("Prospective Sub-Bidders"), fully complete the Electrical Subcontractor's Statements of Pre-Qualifications ("E-SOPQ") package, provide all materials requested herein, and be pre-qualified by the District to be on the final qualified sub-bidder's list. The final list of pre-qualified Electrical Contractors will be stated in the Project Bid Documents In addition to this E-SOPQ, Excavation Support Subcontractors and General Contractors shall also be pre-qualified under a separate, but concurrent, Excavation Support Subcontractor's Statements of Pre-Qualifications ("EXC-SOPQ") and General Contractor's Statements of PreQualifications ("GC-SOPQ"). Should a General Contractor plan to self-perform the electrical work and/or excavation support work, the General Contractor will also need to complete and submit the respective Subcontractor Statement(s) of Pre-Qualification, with the understanding that all references to Electrical Subcontractor or Excavation Support Subcontractor in the Statements of Pre-Qualifications from Interested Electrical Subcontractors or Excavation Support Subcontractors shall mean General Contractor if that work is self-performed. Should a General Contractor be pre-qualified by the District as a General Contractor, and not as an Electrical or Excavation Support Subcontractor, that General Contractor will not be allowed to self-perform the electrical work or excavation support work. Instead, the General Contractor shall use one of the Electrical Subcontractors or Excavation Support Subcontractors that is approved by the District for the electrical and/or excavation support work. Likewise, should a proposing General Contractor be pre-qualified as an Electrical and/or, Excavation Support Subcontractor, and not as a General Contractor, that proposing General Contractor will not be allowed to submit a Bid to the District as a General Contractor. However, that same General Contractor can submit a quote for the electrical and/or excavation support work to any or all of the General Contractors that are approved by the District. The bid opening is scheduled for October 2022, with an anticipated award in November 2022 Construction is anticipated to begin early 2023 and be completed by Fall 2026. The District will post questions and responses received from Prospective Bidders and SubBidders during the SOPQ pre-submission period, and as the District considers necessary, issue any addenda that provide further clarification. Questions shall be submitted via the Questions and Answers link on the Spec 2128I prequalification webpage. Addenda and responses will also be posted on the webpage, and questions will be accepted up until seven (7) workdays prior to the deadline for all SOPQ submissions. It is the Prospective Bidder's and Sub-Bidder's responsibility to frequently check the Spec 2128I webpage for any posted SOPQ pre-submission information The following is a general summary of work and is not considered all-inclusive. 1.2.1 Installation of all work related to the Maintenance and Reliability Improvements at the Upper San Leandro Water Treatment Plant: 1.2.1.1 Raw Water Control o Modifications to existing raw water valve pit, including demolition and replacement of existing 36-inch valve, chemical injection quills, and stairs, and installation of a new canopy. 1.2.1.2 Flocculation Systemo Installation of fifth stage of flocculators within existing flocculation basin(s). o Demolition and replacement of existing flocculation baffles with perforated, stainless steel baffles. 1.2.1.3 Sedimentation Basin o Demolition and replacement of existing trac-vac solids removal system with a cable-vac system with distributed control system (DCS) control within existing sedimentation basin(s). 1.2.1.4 Filter and fluoride buildings o Demolition of filter plant no. 1, including filter beds no. 1 through 6 and associated filter building. o Relocation of emergency plant water system and electrical feeds to accommodate demolition. o Recoating of piping and repair of cracks and recoating of filter pipe gallery walls inside filter plant no. 2. o Demolition of fluoride building. 1.2.1.5 Chlorine Contact Basin (CCB) o Installation of secant pile shoring system to support construction of new CCB and pipeline tie-ins, with the deepest point approximately 35 feet below grade. o Demolition of existing 3.3 MG, buried, rectangular, concrete CCB and construction of a 2.5 MG, buried, circular, prestressed concrete tank with internal concrete baffles. o Demolition and installation of approximately 220-feet of 66-inch pipe, 65-feet of 48-inch pipe, and 110-feet of 30-inch pipe, connected to CCB. o Demolition of pre-CCB chemical injection vault. o Installation of mechanical and structural improvements at the filter effluent flow meter pit. o Installation of treated water flow meter and construction of verification vault. 1.2.1.6 Clearwell o Demolition and replacement of existing wood-framed roof on existing 6.6 MG, open-cut clearwell with low-sloped aluminum roof. 1.2.1.7 Washwater Reclaim and Solids Handling System o Spent washwater reclaim system o Construction of new 480,000 gallon, above-grade, steel spent washwater basin. o Installation of improvements to two existing 480,000 gallon, above-grade, steel spent washwater basins, including recoating, new stairs, extension of basin walls, and installation of seismic improvements. o Installation of improvements to existing reclaim pumping plant (PP), including demolition and replacement of reclaim pumps and settled solids pumps with variable frequency drives (VFDs), and electrical and HVAC improvements. o Solids thickening system o Construction of new 350,000 gallon, above-grade, concrete gravity thickener basin. o Installation of improvements to two existing 725,000 gallon, above-grade, steel detention basins, including recoating and new stairs. o Construction of new gravity thickener decant pumps and polymer feed station. o Installation of improvements to existing solids PP, including demolition and replacement of pumps with new solids transfer and thickened solids pumps with VFDs, and electrical and HVAC improvements. o Reclaim vaults o Construction of two new valve vaults "F2" (19'Lx18'Wx14'D) and "H" (12'Lx8.5'Wx10'D). o Installation of mechanical and electrical improvements to existing valve vaults A, B, C, E, F1, and G. 1.2.1.8 Electrical improvements o Demolition and replacement of main plant switchgear in a new power building. o Demolition and replacement of unit substation 1 (USS-001) including two new transformers. o Construction of new unit substation 2 (USS-002) to power reclaim and solids PPs. o Demolition and replacement of medium voltage transformer serving Oak Knoll / Field PP. o Replacement of the existing automatic transfer switches (ATS) feeding existing motor control center 3 (MCC-003). o Installation of new battery system inside the chemical building. o Installation of additional metering for existing standby generator. o Demolition and replacement of electrical equipment inside the flocculation dry well(s), reclaim PP, and solids PP. 1.2.1.9 Site improvements including new paving and grading, stormwater system modifications, lighting, security cameras, and fencing. 1.2.1.10 Construction of electrical, communications, chemical, and utility tie-ins, as required to complete the project. 1.2.3 Installation of seismic accelerometer and uninterruptable power supply (UPS) at shore of USL reservoir. 1.2.4 Installation of all work related to the Chemical Systems Safety Improvements at the Upper San Leandro Water Treatment Plant and Sobrante Water Treatment Plant: 1.2.4.1 Demolition and replacement of chemical feed systems for primary coagulant, coagulant polymer, treatment-aid polymer, sodium hypochlorite, ammonia,caustic soda, and fluoride, including bulk tanks, pumps, and chemical piping from truck unloading to chemical injection. 1.2.4.2 Installation of temporary chemical feed and storage systems for plant operation during construction of these improvements. 1.2.4.3 Installation of other improvements related to chemical, worker, and environmental safety including: emergency power, fire alarm systems, sprinkler systems and fire sprinkler bracing, emergency eyewash/shower (EES), emergency panic hardware, spray shields, signage and egress, gas detection, chemical leak detection, ventilation improvements, chemical tank roof vents, cable tray bracing, secondary containment for bulk chemical storage, chemical resistant coatings, chemical piping secondary containment, chemical injection quills, chemical tank separation, truck unloading area improvements, and miscellaneous structural, civil, and electrical improvements and modifications. Engineer's Opinion of Probable Total Project Construction Cost $128 to $164 million. Engineer's Opinion of Probable Electrical Subcontractor Work Cost $20 to $26 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Anticipated Project Award November 22, 2022 Anticipated Project Final Completion Fall 2026

Final Planning

Water / Sewer

$164,000,000.00

Public - County

Renovation, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
163
Active Projects
89
Bidding Soon
1,830
All Active Projects
772
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 29, 2022

March 14, 2023

img_map_placeholder

Multiple Locations, Oakland, CA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.