BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 4, 2022 at 8:00 PM

Updated October 24, 2023

Site work and renovation of a civil project in Aurora, Colorado. Completed plans call for site work for a road / highway; for the renovation of a water / sewer project; and water / sewer project.

The Work to be performed under the Project consists of furnishing all labor, materials equipment, tools, supplies including the installation of a new buried interconnection and delivery vault at E. Jewell Ave and Old Tom Morris Rd adjacent to the Murphy Creek Golf Course (MCGC). The Work provides for the installation of a new buried vault structure and its various elements and systems, including: civil sitework, vault structure, electrical, mechanical/HVAC, yard piping/valving, pipe appurtenances, limited demolition, new electrical power feed, new SCADA control panel and process instrumentation, access control and security systems, and safety systems. The principal project elements generally include the following: Miscellaneous demolition, including: Removal and/or salvage of miscellaneous electrical and control infrastructure (including the radio communication system equipment) in and on the existing MCGC Irrigation Pump Station which are related to the adjacent RDS water fill vault, once replacement systems are commissioned and in service for the new Interconnect and Delivery Vault. Partial demolition (using concrete saw cutting methods) of an existing reinforced concrete vault, general piping removal, and backfilling at the existing RDS water fill vault adjacent to the Irrigation Pump Station. Partial demolition of, and piping replacements in, the existing meter vault and flow control vault located at the northeast corner of the MCGC irrigation pond. Partial demolition and removal of the electrical and controls conduits and pull boxes between the Irrigation Pump Station and the meter and flow control vaults. Salvage and delivery to Owner of existing items as defined. Question Acceptance Deadline 07/11/2022 04:00 PM EDT Questions are submitted online No Piggyback Contract No

Post-Bid

Roads / Highways

$2,500,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

42 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
70
Bidding Soon
1,285
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2022

September 23, 2022

Project location map

E Jewell Ave & S Old Tom Morris Rd, Aurora, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.