Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published October 17, 2022 at 8:00 PM

Updated May 15, 2026

Site work for a playground / park / athletic field in Mechanicsburg, Pennsylvania. Completed plans call for site work for a playground / park / athletic field.

As of October 17, 2022, construction is underway and expected to be completed by the end of the month. The work performed in this contract includes the furnishing of all labor, equipment, and materials as required by the Contract Drawings, and as specified herein, for the Winding Hill Park North Softball Field in Upper Allen Township. Work includes softball field improvements including site grading, removal of existing field structures, re-orientation of the field, dugout construction and installation of softball-specific amenities. Work is shown on the Contract Drawings titled, Winding Hill Park North Softball Field, prepared by C.S. Davidson, Inc., Consulting Engineers, dated June 2022, Sheets C10.00 through C10.02, inclusive Sealed bids for softball field improvements, including site grading, removal of existing field structures, re-orientation of the field, dugout construction, and installation of softball specific amenities. Clarification Deadline: 7/13/2022 3:00 PM A bid bond by acceptable surety or a certified check made payable to Upper Allen Township in the amount of 5% of the maximum bid must be provided by each bidder with their bid. Each bidder must be prepared to submit evidence of his qualifications to perform the work. Notice is hereby given to bidders that this project is subject to the provisions of the Pennsylvania Prevailing Wage Act approved August 15, 1961 (Act No. 442, P.L. 987), as amended. Bidders should refer to federal and state statutes, rules and regulations dealing with the prevention of environmental pollution and the preservation of public and natural resources pursuant to PA Act No. 1972-247. The Contract Time for this project forty-five (45) calendar days. Upper Allen Township reserves the right to accept any bid or reject any or all bids. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Under Construction

Playgrounds / Parks / Athletic Fields

$89,800.00

Public - City

Site Work

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
498
Active Projects
209
Bidding Soon
2,924
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2022

August 29, 2022

Project location map

901 E Winding Hill Rd, Mechanicsburg, PA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed