Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a road / highway in Hammond, Wisconsin. Conceptual plans call for site work for a road / highway.
As of January 6, 2023, this project is in the conceptual phase. An engineer has been selected but not awarded. Although a firm timeline for construction has not been determined, construction is not expected to start prior to December 2023. *The closed solicitation has been included below for reference: A noise wall is needed to mitigate the affects of noise on nearby neighborhoods. The perpetuation project for a new noise barrier wall (N-55-0003) on IH 94 (0.0 miles) in St. Croix County on the northbound side of STH 35 at the High Ridge/Hanley Road Interchange. Evaluate the SB side along the exit ramp to determine if the existing noise barrier wall (N-55-0002) length is adequate or needs to be extended. Construct using single lane closures, as needed for access, under peak hour restrictions. Anticipated Construction Cost: $1,000,000-$1,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - NW-03 RFP Engineering- Perpetuation - Noise Barrier Wall Evaluation
Conceptual
Roads / Highways
$2,000,000.00
Public - State/Provincial
Site Work
We’ve obtained documents for this project and are currently processing them.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 19, 2024
I-94, Hammond, WI
Related To This Project
Hammond, WI
Bid Date: Feb 15 2023
Hammond, WI
Bid Date: Apr 26 2023
Hammond, WI
Bid Date: Jun 02 2023
Hammond, WI
Bid Date: Mar 09 2022
Hammond, WI
--
Waunakee, WI
--
Land O Lakes, WI
Bid Date: Sep 14 2022
Milwaukee, WI
--
Milwaukee, WI
--
Sturgeon Bay, WI
Bid Date: Sep 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.