Site work for a water / sewer project in Madisonville, Tennessee. Completed plans call for site work for a water / sewer project.

For Carson Road/McConkey Street Water Lines and Miscellaneous Fire Hydrant Replacements 4,900 L.F. of 6-inch PVC Water Line 40 L.F. of 6-inch DIP Water Line Install 39 Fire Hydrants Replace 35 Water Service Connections, Valves, and Other Appurtenances The allotted time for construction for Contract 22-01 is ninety (90) calendar days; liquidated damages for non-completion are $1,000 per calendar day. All bidders must be licensed general contractors as required by the Contractors Licensing Act of 1976 of the General Assembly of the State of Tennessee and qualified for the type of construction being bid upon. EACH BIDDER SHALL WRITE ON THE OUTSIDE OF THE ENVELOPE CONTAINING THE BID THE CONTRACTOR'S LICENSE NUMBER, THE EXPIRATION DATE, AND THAT PART OF THE CLASSIFICATION APPLYING TO THIS BID. If this is not done, the bid will not be opened. Each bidder must deposit with his/her bid, security in the amount, form and subject to the conditions provided in the Instructions for Bidders. The successful bidder is required to furnish both an acceptable performance bond and payment bond each in the amount of one hundred percent (100%) of the contract price. Each bidder shall be properly licensed and abide by the provisions of TCA 62-6-119 including part (b) which states in part: All bidders shall comply with all provisions of TCA 50-9-113 as it relates to Drug Free Workplace requirements. The Contractor shall complete the Drug-Free Workplace Affidavit of the Prime Bidder form and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor(s) compliance with said law. All bidders shall comply with all provisions of Chapter 878 of TCA 12-4-1 as it relates to certification of compliance regarding illegal immigrants. The Contractor shall complete the Statement of Compliance Certificate Illegal Immigrants and submit it with his/her bid. The Contractor shall be responsible for any of its Subcontractor's compliance with said law. All bidders shall comply with all provisions of Chapter 817 of TCA 12-12-106 as it relates to certification of compliance regarding the Iran Divestment Act. The Contractor shall complete the Statement of Compliance Certificate Iran Divestment Act and submit it with her/her bid. The Contractor shall be responsible for any of its Subcontractor's compliance with said law. The Owner reserves the right to reject any or all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 90 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary

Award

Water / Sewer

$696,616.00

Public - City

Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Summary of Work, Work by Owner, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Closeout Submittals, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation, Trenching, Backfill, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Seeding, Sodding
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration

Find More Local Projects

Within 75 Miles of This Project
80
Active Projects
39
Bidding Soon
517
All Active Projects
248
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2022

September 1, 2022

img_map_placeholder

Multiple Locations, Madisonville, TN

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Carson Road/McConkey Street Water Lines and Miscellaneous Fire Hydrant Replacements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.