BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published October 7, 2022 at 8:00 PM

Updated September 15, 2023

Site work and paving for a mixed-use development in Willard, Wisconsin. Conceptual plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

As of October 7, 2022, this project is in the conceptual phase. An engineer has not been selected. Although a firm timeline for construction has not been determined, construction is not expected to start prior to July 2023. *The closed solicitation has been included below for reference: The pavement needs treatment to extend its service life. Perpetuation project to mill and overlay 11.87 miles of STH 27 from the Chippewa/Rusk County Line to USH 8, Towns of Willard and Grant, and City of Ladysmith, Rusk County. Other work includes concrete surface repair on structure B-54-0046, railroad crossing surface (City of Ladysmith) and railroad signals/gates, traffic signal, culverts, replace all guardrail, curb & gutter spot replacement, base aggregate shouldering, pavement markings, and curb ramps work. Resurfacing and bridge work proposed to be done under traffic with railroad crossing work done under a detour Anticipated Construction Cost: $7,000,000-$7,999,999 The contract price will be based on an estimate of the selected consultant's actual costs plus fixed fee. Actual costs will be defined as those costs allowable under the cost principles in Part 31 of Federal Acquisition Regulation (FAR). Consultant costs including indirect cost rates and cost accounting system will be subject to audit. Consultant firms that are unable to account for costs consistent with requirements of the FAR are not eligible to contract. Consultants selected will be required to either submit or have on file with WisDOT a Consultant Financial Report prior to contract execution. Advertised Fixed Fee % : 7.25 Fixed Fee Notification : The fixed fee for this contract will apply an indirect cost factor of 150% to the consultant's estimated direct labor, regardless of the consultant's actual indirect rate. Interview: Interviews will not be conducted The method of contractor selection has not been determined at this time. WisDOT - NW-06 RFP Engineering - Perpetuation - Resurfacing additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Conceptual

Roads / Highways

$8,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
24
Bidding Soon
376
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 20, 2023

Project location map

WI-27, Willard, WI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.