EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 16, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a mixed-use development in Northbrook, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

City: Northbrook County: Illinois State/Province: IL Site Directions: Cedar Lane from Cherry Lane south to Village Hall access in the Village of Northbrook, Cook County. Project Category Code: ADA Curb Ramps, Safety Improvements, Pavement - Marking, Construction, Sidewalks/Curbs/Gutters, Aggregate, Street/Road Asphalt Resurfacing and Milling, Sawcutting/Sidewalk/Pavement, Pavement Removal, Excavation, Walkway/Passage/Corridor, Paving (Asphalt or Concrete), Street/Road Intersection Improvements, Roadway Pavement Markings, Street/Road Intersection Construction and Repair, Street/Road Lane Construction and Repair, Pedestrian Improvements, Street/Roadway Reconstruction , Street/Road Pavement Marking, Street/Road Repairs, Curbs, Signage Description: Construction of approximately 1,890 square yards of partial depth patching and 362 square yards of Class D patching on Cedar Lane and the intersection of Cherry Lane and Cedar Lane in the Village of Northbrook, Illinois.

Award

Roads / Highways

$225,000.00

Public - City

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry
Division 08 - Openings

Division 08 - Openings

Hardware
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earth Moving, Excavation and Fill, Excavation, Trenching, Compaction
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Pruning, Watering, Bases, Ballasts, and Paving, Curbs and Gutters, Planting

Find More Local Projects

Within 75 Miles of This Project
229
Active Projects
130
Bidding Soon
2,465
All Active Projects
1,035
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 7, 2022

September 6, 2022

img_map_placeholder

Cedar Ln, Northbrook, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Cedar Lane Roadway Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.