BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 9, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a road / highway in Orange, California. Completed plans call for site work for a road / highway.

Site Directions: 319 W Chapman Avenue Orange, CA 92886 The work to be done in general consists of upgrading the existing traffic signal at the intersection of Tustin Street at La Veta Avenue - Rock Creek Drive. Work items will include, but not limited to: replacing existing traffic signal controller assembly complete on existing foundation, traffic signal controller unit, traffic signal cabling, upgrade of video detection system, LED luminaires, Internally Illuminated Street Name Signs (IISNS), signage, traffic control, and all labor, equipment, materials, and incidentals necessary for completion of work.

Award

Roads / Highways

$104,678.00

Public - City

Site Work

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
161
Active Projects
0
Bidding Soon
1,913
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2022

August 22, 2022

Project location map

319 W Chapman Ave, Orange, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.