Site work for a water / sewer project in Griffin, Georgia. Completed plans call for site work for a water / sewer project.

The approximate extent and character of the Work is generally described as follows: Installation of approximately 2,900 linear feet of 8-inch DIP sanitary sewer main, 15 concrete manholes, and related PVC sewer laterals. Installation of the sewer will also include related saw cut, demolition, and patching of the streets in the project area. Contractor questions regarding the bid should be directed to Jason Graham via email at jgraham@pcgeng.com. All questions must be submitted in writing. The last day for contractor questions is Wednesday, July 20, 2022 at 12:00 PM. The time allowed for Substantial Completion is 210 days, and the time allowed for completion and readiness for final payment is 240 days from the date of commencement. Each Bid must be accompanied by a Bid Bond completed on the attached Bid Bond Form with good and sufficient surety or sureties approved by the owner for faithful acceptance of the contract, payable to, in favor of, and for the protection of the OWNER in an amount equivalent to five (5%) of the total amount payable by the terms of the contract, in lieu thereof, in the form of a certified check, cashiers check, or cash in equal amount. Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required.Performance and Payment Bonds, each in an amount at least equal to 110 percent of the contract amount, and a Certification of Insurance will be required. This is a Section 3 Covered Project under the HUD Act of 1968 and Section 3 Residents and Business Concerns are encouraged to apply. Spalding County Water & Sewerage Facilities Authority is committed to providing all persons with equal access to its services, programs, activities, education, and employment regardless of race, color, national origin, religion, sex, familial status, disability or age. A Certification of Insurance will be required from the low bidder prior to award of the Contract. All Bids will remain subject to acceptance for ninety days after the day of the Bid opening, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to that date. The Owner reserves the right to reject any or all Bids, to waive formalities and re-advertise.

Post-Bid

Water / Sewer

$700,000.00

Public - County

Site Work

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
147
Active Projects
90
Bidding Soon
1,500
All Active Projects
637
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 25, 2022

img_map_placeholder

Multiple Locations, Griffin, GA

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.