BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in Carlsbad, California. Completed plans call for site work for a water / sewer project.

As of October 18, 2022, the project has been awarded. A timeline for construction has not been confirmed. The Carlsbad Municipal Water District is seeking a contractor to provide all labor, equipment and materials to construct approximately 1,980 lineal feet (LF) of 8-inch through 12-inch diameter polyvinyl chloride (PVC) potable water distribution pipeline at the McClellan-Palomar Airport in the City of Carlsbad, California and including isolation valve, blow-off, air valve, fire hydrant, fire service and water service assemblies; removal and disposal of approximately 1,100 LF of asbestos cement pipe (ACP); abandonment in-place of approximately 1,810 LF of 6- through 12-inch diameter ACP and steel pipeline; and all incidental work including, but not limited to, surveying and construction staking; utility locating and potholing; stormwater and non-stormwater pollution prevention; excavation support systems; traffic control; earthwork; containerization and environmental testing of excavated soils; disposal of unsuitable soils and potentially including hazardous materials to a Resource Conservation and Recovery Act (RCRA) Waste Disposal Facility; pipeline hydrostatic testing and disinfection; connections to existing water distribution pipelines; paving and site restoration and coordination with the City of Carlsbad, Carlsbad Municipal Water District, County of San Diego and McClellan-Palomar Airport. Response Format Electronic Project Type Bid Response Types Line Items Subcontractor Bid Bond Bidders Statement of Technical Ability and Experience (required) Bidders Certificate of Insurance (required) Bidders Statement Re Debarment (required) Bidders Disclosure of Discipline Record (required) Noncollusion Declaration (required) Type of Award Lump Sum License Requirements A *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Water / Sewer

$1,879,130.00

Public - City

Site Work

19

11

30

15

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
215
Active Projects
101
Bidding Soon
2,288
All Active Projects
1,027
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 7, 2022

November 8, 2022

img_map_placeholder

2198 Palomar Airport Rd, Carlsbad, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.