Site work for a mixed-use development in Southport, North Carolina. Completed plans call for site work for a educational facility.
SCOPE OF WORK & SCHEDULE The contractors are responsible for all items required to complete the scope of services; those items being included in the scope of services even if not listed below. The subcontractor's workmanship shall be equal to or exceed the workmanship of reputable contractors performing similar work in the Wilmington Metropolitan Service Area. Contractor shall perform the following scope of work in compliance with all federal, state, and local codes and in accordance with any plans, specifications and engineered drawings, design, or criteria. The general scope involves furnishing and installing of Aluminum Canopy Systems. Work to include but not limited to suppling of Engineered Drawings, include any cost for geotechnical soil borings or data if needed or required, include permit cost, include all material and labor for the layout of footings, dig, prep and place footings for canopy systems, and installation of canopy systems, and all incidental work relating to the project to provide the complete and fully functional operating canopy systems. Contractor is responsible for scope and to verify all dimensions and sizes. The Contractor shall begin the work upon receipt of the Purchase Order, and expeditiously, with adequate forces, complete the work within the specified calendar days. The required milestone dates, and completion date are included in Exhibit 1. The contractor shall coordinate all work with Operations personnel to ensure minimal disruption to school activities. Should the Contractor fail to substantially complete the Work on or before the date stipulated for Substantial Completion, or such later date as may result from extension of time granted by Owner, he shall pay the Owner, as liquidated damages, the sum of One Hundred Dollars ($100.00) for each consecutive calendar day that terms of the contract remain unfulfilled beyond the date allowed by the Contract, which sum is agreed upon as a reasonable and proper measure of damages which the Owner will sustain per day by failure of the Contractor to complete Work within time as stipulated; it being recognized by the Owner and the Contractor that the injury to the Owner which could result from a failure of the Contractor to complete on schedule is uncertain and cannot be computed exactly. In no way shall costs for liquidated damages be construed as a penalty on the Contractor. Brunswick County Schools is informally requesting bids for the performance of the following work or services. Bids shall be binding for 30 days. Information regarding this Informal Bid Request may be obtained from David Barbour at office (910) 782-5060, mobile (910) 274-1076 or dbarbour@bcswan.net. Bids can be delivered by dropping off at Capital Projects Office and placing in Drop Box outside of Capital Projects Office at 199 Sessions Drive, Bolivia, NC 28422 or emailed to informalbids@bcswan.net. Emailed bids should reference Bid Request Number in the Email Subject Field. Projects will be awarded based on cost, adherence to Informal Bid Request requirements, contractor's ability to meet the schedule, and contractor's references. Contractor must be able to comply with Brunswick County Schools Terms and Conditions (attached). The Brunswick County Board of Education has a right to reject any or all bids, pursuant to NC Statute and Board of Education Policy, and to waive any or all informalities.
Bid Results
Sidewalks / Parking Lot
$133,420.00
Public - County
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2022
August 3, 2022
100 Cougar Rd, Southport, NC
Related To This Project
Southport, NC
Bid Date: Jun 08 2022
Southport, NC
Bid Date: Jul 06 2022
Southport, NC
Bid Date: Aug 09 2022
Southport, NC
--
Southport, NC
--
Southport, NC
Bid Date: Sep 12 2022
Southport, NC
Bid Date: Sep 12 2022
Southport, NC
Bid Date: Mar 30 2021
Southport, NC
--
Southport, NC
--
Southport, NC
Bid Date: Mar 15 2022
Southport, NC
Bid Date: Mar 20 2019
Southport, NC
Bid Date: Dec 08 2022
Southport, NC
Bid Date: Nov 16 2022
Southport, NC
Bid Date: Nov 17 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.