BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Addison, Illinois. Completed plans call for site work for a water / sewer project.

It is the intent of this specification to provide for the cleaning, root cutting (as necessary), and reconstruction of approximately 780 lineal feet by the installation of cured-in-place pipe (CIPP). CIPP is formed by the insertion of a resin-impregnated flexible felt tube into the existing pipe. The tube is expanded in an inversion process to fit against the original conduit, and then heated to cure the resin. The finished product shall be a joint- less, structural pipe that is formed to the existing pipe. All materials, labor, and equipment shall be provided by the successful bidder, through this not-to-exceed bid price, to provide a complete turn-key project. Completion of project will be by Nov.1st, 2022. At the precise time set for bid opening, bids will legally be made public. Bidders or their representatives are encouraged to attend the bid opening. Prevailing Wages: The work of this Project is subject to the Illinois Prevailing Wage Act, 820 ILCS 130/0.01 et seq. A prevailing wage determination has been made by the Illinois Department of Labor for public works projects in DuPage County. The Contract entered into for the work will be drawn in compliance with said law and proposals should be prepared accordingly and provide for payment of all laborers, workmen, and mechanics needed to perform the work at no less than the prevailing rate of wages (or the prevailing rate for legal holiday and overtime work) for each craft, type of worker, or mechanic. For purchases of materials, goods or equipment, the materials, goods or equipment purchased must be delivered within thirty calendar (30) days from the date of execution of the Contract unless a specific delivery date is stated on the bid. Contract may be cancelled without obligation by the Village if delivery requirements are not met. If said Contract is not cancelled by the Village, liquidated damages may be due and owing to the Village pursuant to the liquidated damage provision enumerated herein. All deliveries must be made on Monday through Friday, excluding Village holidays, between the hours of 8:00 am and 4:00 pm. Contractor is expected to ship in full truckload quantities within said thirty (30) day period unless prior approval has been granted by the Village in advance for circumstances beyond the control of the Contractor. The Village reserves the right to (i) reject all bids; (ii) reject only certain bids which are non-conforming or non-responsive to the bid requirements; (iii) accept only a portion, part or specific items of work of all and reject others, as the Village shall in its sole discretion determine to be in its best interest; and/or (iv) award the Contract to the responsible bidder submitting the lowest bid responsive to the bidding requirements. No bid will be accepted from or Contract awarded to any person, firm or corporation that is in arrears or is in default to the Village upon any debt or contract, or that is a defaulter, as surety or otherwise, upon any obligation to said Village or that has failed to perform faithfully any previous contract with the Village. A. 746 Comstock Ave. to 100 Comstock Ave. (157 ft.) B. 100 Comstock Ave. to 108 Comstock Ave. (79 ft.) C. 108 Comstock Ave. to 114 Comstock Ave. (71 ft.) D. 114 Comstock Ave. to 136 Comstock Ave. (252 ft.) E. 136 Comstock Ave. to 725 S. Harvard Ave. (219 ft.)

Award

Water / Sewer

$43,500.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
182
Active Projects
121
Bidding Soon
1,813
All Active Projects
793
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2022

August 17, 2022

img_map_placeholder

Multiple Locations, Addison, IL

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.