EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 15, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a sidewalk / parking lot in Morrisville, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

This project involves a base bid and alternate bid for the design and construction of ADA/PennDOT compliant curb ramps, with all necessary sidewalks, curbing, and sign relocation/installation at specified locations within Morrisville Borough. Each bid shall be submitted in accordance with the Instructions to Bidders and must be accompanied by a Bid Bond or Certified Check for not less than ten percent (10%) of the Bid amount payable to Morrisville Borough along with an Agreement of Surety certifying that the required Performance and Payment Bonds will be provided to the Bidder. The successful Bidder shall be required to furnish proof of insurance and bonds for Performance, Payment and Maintenance in such form as meets the approval of Morrisville Borough and having as security thereon such Surety company or companies as are approved by Morrisville Borough. The work to be performed under this Agreement is a project assisted under a program providing direct Federal financial assistance from HUD and its subject to the requirements of Section 3 of the Housing and Urban Development Act of 1968, as amended (12 U.S.C. 1702). Section 3 requires that to the greatest extent feasible opportunities for training and employment be given to low-and very low-income residents of the project area, and that contracts for work in connection with the project be awarded to business concerns that provide economic opportunities for low- and very low-income persons residing in the metropolitan area in which the project is located. Clarification Deadline: 7/12/2022 11:00 AM The Bidder's attention is called to the fact that the project is receiving funds under Title I of the Housing and Community Development Act of 1974, as amended, and that the Davis-Bacon Act applies to this Contract and the successful Bidder shall pay no less than the Federal Wage Rates determined for the project area as set forth in the Contract Documents. The successful Bidder must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex or national origin. The completion of all CDBG Non-Discrimination Documents must also be submitted at the time of the bid. This project is subject to applicable requirements of the Borough's Responsible Contractor Ordinance for work valued at over Two Hundred Thousand Dollars ($200,000.00). This project is subject to applicable provisions of Act 127, Pennsylvania Public Works Employment Verification, as amended. Title VII of the Civil Right Act of 1964 and Executive Order 11246; 29 CFR Parts 1, 3, 5, 6, and 7 Davis-Bacon Act; 40 U.S.C. 327-333 Contract Work Hours and Safety Standards Act. Prospective bidders should not submit their bids until 10 day prior to the bid opening date. With the understanding that the Davis Bacon Wage Determination modification posted herein was in effect as of the posting date, and that the determination must be checked for and update before submitting a bid; the latest modification within 10 days of the bid opening must be used. No Bidder may withdraw his bid within ninety (90) days after the date set for the opening of the bids. The Borough of Morrisville reserves the right to reject any and all bids, or parts thereof, and to accept the bid, which it deems, in its sole judgment, to be in the best interest of the Borough. PN - 2021-03026.01

Bid Results

Sidewalks / Parking Lot

$46,502.00

Public - City

Paving, Site Work

Subscribe For Documents

30 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Temporary Facilities and Controls, Construction Facilities, Vehicular Access and Parking, Traffic Control, Temporary Controls, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Progress Cleaning, Closeout Procedures, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Subsurface Investigation, Material Testing
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Joint Protection, Preformed Joint Seals, Joint Fillers
Division 08 - Openings

Division 08 - Openings

Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Wall Finishes, Stone Facing, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage, Traffic Signage
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Other Conveying Equipment, Facility Chutes
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Testing, Adjusting, and Balancing for HVAC
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Fine Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Tactile Warning Surfacing, Planting, Turf and Grasses, Seeding
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
472
Active Projects
304
Bidding Soon
4,865
All Active Projects
2,078
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

November 14, 2022

img_map_placeholder

Multiple Locations, Morrisville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - CDBG Design/Build Curb Ramp Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.