BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and outdoor lighting for a playground / park / athletic field in New Orleans, Louisiana. Completed plans call for outdoor lighting for a playground / park / athletic field.

*This event is replacing event 22* The Contractor shall provide all labor, materials, tools, equipment, facilities, supervision, management, financing, services, shop drawings, submittals, testing, and other items necessary for the proper execution and functioning and shall make all installations and connections necessary, specified, customary, or otherwise appropriate to perform fully and to complete in every respect the contract work generally described as follows: (Specification or drawing references included in the following statement of Subcontract work are applicable but not necessarily all inclusive Harris Playground - 4998 Piety: HML Repairs. Pole #1 - (Pole above play area) Remove and replace (2) fiat panel 1 000W equiv. LED fixtures with brackets. Remove and replace (2) 30A fuses. Supply and install SO cord whip for each fixture. Pole #3 Install catchall and reattach triplex. Pole #4 Remove and replace (4) fiat panel 1000Wequiv LED fixtures with brackets. Remove and replace (2) 30A fuses Remove and replace 1 phase, 30A, N3R side arm disconnect and hub Replace conduit and weatherhead Install catchall and reattach triplex Supply and install SO cord whip for each fixture Pole #5 Remove and replace (4) fiat panel 1000Wequiv LED fixtures with Brackets Remove and replace (2) 30A fuses Supply and install SO cord whip for each fixture Pole #6 Remove and replace (4) fiat panel 1000Wequiv LED fixtures with brackets. Remove and replace (2) 30A fuses Supply and install SO cord whip for each fixture Contractor to supply all material, lift rental, clean all construction debris, set time clock for approved time by NORDC, adjust and check all HML's for proper operation. Remove all construction debris and dispose off site. Repair any damage caused to site during work performed. All materials, equipment, supplies, fasteners, and other items required to perform work tasks to be supplied and installed by contractor. All trash and debris to be removed by contractor and hauled off. Do not use City dumpster. Clean area when work is complete. Area to be ready for business use when finished. f any equipment is found to be defective it is to be identified to owner for approval of repair/replacement. All material shall conform, to the latest issue of all applicable standards established by NEMA, and underwriters laboratories, inc. and shall bear manufacturer's trade and brand name. All work shall be installed and completed with the latest rules and regulations of the ASME. NFPA.NEC and all State and local codes and standards and such work not so installed shall be removed and reinstalled at the Contractor .. s expense. Warranties on all furnished equipment and industry standards on parts and labor, all manufacturers warranties should apply. Personal Protective Equipment to be worn at all times and a safe working environment is to be maintained Q and a open: July 6, 2022 11:30:00 PM Q and a close: July 11, 2022 11:30:00 PM

Award

Playgrounds / Parks / Athletic Fields

$19,360.00

Public - City

Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
100
Bidding Soon
1,093
All Active Projects
544
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 12, 2022

August 11, 2022

img_map_placeholder

4998 Piety Dr, New Orleans, LA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.