Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a road / highway in Northbrook, Illinois. Conceptual plans call for site work for a road / highway; and for paving for a road / highway.
The surface layer of pavement on Skokie Boulevard between Lake Cook Road and the Village's southern limit needs to be replaced. The roadway was last resurfaced in 2006 and is currently rated as having many failures. Roadways rated as having many failures (2 on a scale of 5) have large potholes and signs of the base beginning to fail will become evident. Examples of these failures include alligator cracking and failure of the roadway surface. The surface has been repeatedly patched and its condition is reaching a point where patching will no longer be an option. In FY 2020/2021, the Village received notice that this project is the North Shore Council's top rated contingent project for funding in the 2021-2025 Transportation Funding Program. The North Shore Council is a group of 11 municipalities representing local governments on transportation issues through the Chicago Metropolitan Agency for Planning (CMAP). If another funded project does not move forward, this project will be scheduled in its place with 80% of costs covered. In FY 2020/2021, staff completed 90% of the necessary design work, final details would be completed before letting the project. This project is included in the city's 2023-2027 Capital Improvement Plan (CIP). As of June 27, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Roads / Highways
$2,521,311.00
Public - City
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
January 2, 2026
Skokie Blvd, Northbrook, IL
Related To This Project
Northbrook, IL
Bid Date: Feb 16 2023
Northbrook, IL
--
Northbrook, IL
Bid Date: Jun 21 2022
Northbrook, IL
--
Northbrook, IL
Bid Date: Jun 07 2022
Northbrook, IL
Bid Date: Apr 25 2022
Northbrook, IL
Bid Date: Apr 12 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.