BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2022 at 8:00 PM

Updated September 14, 2023

New construction of a playground / park / athletic field in Summerstown, Ontario. Completed plans call for the construction of a 9,600-square-foot, one-story above grade playground / park / athletic field.

The 9,600-square-foot skatepark. The park will be located at the A'nowara'ko:wa Arena. TIMELINE: Ground breaking ceremony has recently taken place. The park is set to officially open to the public come mid-September 2022. A grand opening is tentatively set for September 17, 2022. Award amount was not released for publication, however, the total project cost has been estimated at 407,300.

Under Construction

Playgrounds / Parks / Athletic Fields

$407,300.00

Public - Federal

New Construction

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
43
Bidding Soon
2,677
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 24, 2022

Project location map

36 Phillip Hopps Memorial Rd, Summerstown, ON


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.