Published August 7, 2025 at 8:00 PM
Updated August 8, 2025
Site work and paving for a bridge / tunnel in Jefferson, Maryland. Conceptual plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Update: Bridge No. F03-04. This project is for the replacement of the existing weight-restricted two-span reinforced concrete bridge on Holter Road over Hollow Creek. The crossing is currently posted at 40,000 lbs for single units and 57,000 lbs for combination units. The bridge structure is in fair condition and the waterway opening is inadequate. The 2022 ADT at the bridge is 3101 vehicles per day. Project is included Frederick County Fiscal Year 2026-2031 ---------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- UPDATE:https://user-zhchula.cld.bz/FY2025-FY2030-Adopted-Capital-Improvement-Program/IV/ Bridge No. F03-04. This project is for the replacement of the existing weight-restricted two-span reinforced concrete bridge on Holter Road over Hollow Creek. The crossing is currently posted at 40,000 lbs for single units and 57,000 lbs for combination units. The bridge structure is in fair condition and the waterway opening is inadequate. The 2022 ADT at the bridge is 3101 vehicles per day. Project is in Frederick County capital budget fy 2025 - 2030 CIP page 172 ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Bridge No. F03-04. This project is for the replacement of the existing weight-restricted two-span reinforced concrete bridge on Holter Road over Hollow Creek. The crossing is currently posted at 40,000 lbs for single units and 57,000 lbs for combination units. The bridge structure is in fair condition and the waterway opening is inadequate. The 2008 ADT at the bridge is 2796 vehicles per day. The project is included in the county's 2023-2028 Capital Improvement Program (CIP). As of June 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$1,935,300.00
Public - County
Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2028
Holter Rd, Jefferson, MD
Related To This Project
Jefferson, MD
--
Jefferson, MD
Bid Date: Jun 29 2023
Jefferson, MD
--
Jefferson, MD
Bid Date: Aug 11 2021
Jefferson, MD
Bid Date: Aug 09 2018
Jefferson, MD
Bid Date: Dec 14 2023
Jefferson, MD
Bid Date: Mar 21 2019
Jefferson, MD
Bid Date: Apr 07 2025
Jefferson, MD
Bid Date: Jan 19 2023
Mount Airy, MD
--
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.