Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 16, 2023 at 8:00 PM
Updated January 26, 2024
Site work and new construction of a water / sewer project in San Francisco, California. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.
Biosolids Digester Facilities - T-07.14: Exterior Skin Systems Supply and Installation This work will be performed at the Southeast Treatment Plant. This is an operating wastewater plant with extensive above- and below-grade infrastructure that must remain in continuous operation at all times. A brief description of the Scope of works This package includes the supply and installation of all glazing, curtain wall, skylight, and storefront assemblies interior and exterior for facility 615. Facility 615 is a 3-storey structure (approx. 39,000 sq ft) including channel glazing at the east and west stairwells, Storefront on the south side and windows on all sides. All aluminum window fins are included in this scope of work. All transom glazing embedded in door frames will be installed by others. Also included is all automatic doors, operators, actuators, and pedestals that fall within any storefront I glazing assembly. Additionally, please include all necessary and/or called out air barriers, membranes, caulking, and flashing for all glazing, curtain wall, and storefront assemblies interior and exterior for B615. Excludes electrical raceways and conduits required for automatic door assemblies (by others). Applicants who pre-qualify as Bidders are required to seek, and are encouraged to use, Disadvantaged Business Enterprises (DBEs) for their subcontracting and procurement needs. These requirements apply to all subcontracts for equipment, supplies, construction, and services. The SFPUC has adopted the following Fair Share Objectives for participation of DBEs in this SRF funded project. These are projectwide participation goals that the Contractor may seek to meet: 5.6% MBE 1.2% WBE . *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Under Construction
Water / Sewer
$2,000,000.00
Public - City
New Construction, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
