BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Menominee, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

On behalf of the City of Menominee, Coleman Engineering Company is requesting bids for road reconstruction located in the City of Menominee. The purpose of this project is to replace a concrete roadway at the end of its service life while improving drainage patterns. If you are in need of further clarification of any of the above items, please contact me by phone at (906) 774-3440 at your earliest convenience. Removals: Remove all storm sewer, catch basins and manholes within the project limits, except for the 24-inch concrete storm sewer leaving the manhole at 11+92, 33.5' RT. Remove all pavement (HMA and concrete) and curb and gutter from within the project limits. Install erosion control, inlet protection, fabric drop in existing catch basins and maintain until project completion. Storm Sewer: At 11+92, 33.5' RT, place a 72-inch diameter manhole with a Type B cover. All other catch basins shall be 24-inch diameter (2) catch basins or 48-inch diameter (2) with Type K covers. Place the drainage structures at the locations located on the plans with the rim elevations as indicated. Install new storm sewer, Cl E, 12-inch, Tr Det E between the drainage structures. Maintain positive drainage to the maximum extent practicable. Provide the City with as-built information for the installed storm sewer. Road Reconstruction: The roadway structure will be an 8-inch aggregate base and 3 inches of HMA, 5EL placed in two (2) lifts. Grade the existing area, as required, to maintain positive drainage and match the elevations indicated on the plans. Install new curb, Curb and Gutter, Conc, Det C2, as indicated on the plans All work is to be performed in accordance with the Michigan Department of Transportation 2020 Standard Specifications for Construction. The Contractor will have a maximum of 30 working days from mobilization on the site to complete the work described herein. The Contractor will not begin work before July 18, 2022 and the work shall be completed by November 11, 2022.

Post-Bid

Roads / Highways

$400,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
89
Active Projects
65
Bidding Soon
379
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 8, 2022

July 18, 2022

Project location map

Cemetery Road, Menominee, MI


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.