BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 15, 2022 at 8:00 PM

Updated September 14, 2023

Demolition, site work, paving and new construction of a mixed-use development in Spirit Lake, Iowa. Working plans call for the demolition of a water / sewer project; for the construction of a water / sewer project; for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

No Bids Received From the intersection of Center Lake Drive and 25th Street Northwest approximately 450' on the west side of the road. The City of Spirit Lake, in Dickinson County, Iowa, will meet on July 26, 2022, at 5:30 pm, at which time and place a public hearing will be held in the Council Chambers in the Spirit Lake City Hall located at 1803 Hill Ave, Spirit Lake, Iowa 51361 on the proposed plans and specifications, form of contract and estimate of cost for the 2022 City of Spirit Lake Center Lake Lift Station Project for said City. Proposals will be acted on by the Spirit Lake City Council at the aforementioned public hearing or at such later time and place as may then be fixed. Est. Value: $ 292,562.00. Work to Be Done: Work generally consists of the removal and replacement of an existing lift station, including, but not limited to: - Grading, and Excavation - Sanitary Sewer Gravity Main, Force Main, and Structures - Erosion Control Items - 6" P.C. Concrete Pavement - Dewatering

Final Planning

Water / Sewer

$292,562.00

Public - City

Demolition, New Construction, Paving, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
48
Bidding Soon
458
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2022

August 22, 2022

Project location map

Center Lake Dr & 25th St, Spirit Lake, IA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.