BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a water / sewer project in Greenfield, California. Working plans call for the renovation of a water / sewer project.

As of August 30, 2024, this project is in the design phase and the 90% submittal is scheduled for the end of September 2024. The project has also submitted a funding request to the California State Clean Water Revolving fund which is under review. The City hopes to be able to bid the project in late 2025 but that will depend on State of California approval. Closed solicitation has been included below for reference. ------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Consultants must direct all inquiries to the City in writing, via email to Tony Nisich, P.E. tnisich@mnsengineers.com. All inquiries will be responded to in writing, and questions and responses will be disseminated to all consultant teams for their consideration. The origination of the questions will not be disclosed. All inquiries must be received no later than Thursday, July 14, 2022 at 5pm in order to receive responses from the City. The City owns and operates the wastewater collection, treatment, and disposal facilities that serve a population of approximately 17,700 residents. The collection system has nearly 4,000 sewer connections, most of which are residential. There are about 150 commercial connections and around ten industrial connections. The City's existing WWTP was originally constructed in 1978 and has since been upgraded and expanded several times. The WWTP consists of a headworks that includes a bar screen and splitter box, three primary clarifiers to remove settleable solids, and a series of aeration ponds to reduce biological oxygen demand. Treated effluent is disposed via spreading and percolating effluent in disposal fields adjacent to the aeration ponds. Sludge and scum from the primary clarifiers are pumped to an aerobic digester. Digested sludge is sent to sludge drying beds where the moisture evaporates, and the dried sludge is hauled offsite to a landfill.

Final Planning

Water / Sewer

$91,000,000.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
14
Bidding Soon
458
All Active Projects
177
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2025

img_map_placeholder

Multiple Locations, Greenfield, CA


Try it free. The data you need to build the relationships you want.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.