BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 19, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of a medical facility in Medical Lake, Washington. Completed plans call for the renovation of a medical facility.

Eastern State Hospital - Westlake Patient Safety Bathrooms ESTIMATED BID COST RANGE: $551,000.00 to $609,000.00 (The hospital) has approved the following BHA guidelines regarding contractors: 1. Limit the exposure on the wards for bid purposes to 15 minutes per group. 2. Limit Access to the General Contractor only for bid purposes. 3. Limit the group to four individuals plus the one escort for no more than five individuals. 4. Provide the appropriate PPE for the ward status. Hospital provides the PPE for the contractors. 5. Provide a quick COVID training session to include the definitions of the different ward colors. This training occurs at the pre-bid conference before the walk-through. 6. Work with nursing staff (DONs) to assist with limiting exposure for staff and patients. Internal staff will work with the nursing staff.7. No access to RED wards. For awarded projects the contractor is to coordinate with the Hospital for the needed PPE to work on wards dependent on the restriction status. PPE: o Blue surgical grade masks. These are given out by the hospital when the contractors are screened daily. o Face shield (glasses are not accepted as a substitute) are to be provided by the contractor. FPS will be accepting mailed-in or hand-delivered bids. Contractors are highly encouraged to mail bids whenever possible in an effort to stay home and stay healthy. Clearly identify that it is a SEALED BID on the outside of the envelope. Include an attention line in the address to ensure that the bid is routed correctly. Please direct questions regarding this project to the Office of the Consultant ALSC Architects, P.S., 203 N. Washington, Suite 400 Spokane, WA 99201, telephone (509) 838-8568, fax (509) 458-3710. The successful bidder is required to comply with the COVID-19 Safety and Vaccination Verification Declaration Requirements in the Supplemental Conditions for Washington State Facilities Construction and provide the Vaccination Verification Declaration prior to award of the contract. The State reserves the right to accept or reject any or all bids and to waive informalities. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Medical

$611,811.00

Public - State/Provincial

Renovation

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
1
Bidding Soon
187
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2022

August 22, 2022

Project location map

1451 Maple St, Medical Lake, WA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.