BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a mixed-use development in San Diego, California. Completed plans call for the construction of a 43,000-square-foot educational facility; and for site work for a educational facility.

As of March 15, 2024, construction is underway. The owner has selected a Design Builder.  The Project approximately consists of: The project will construct new standalone laboratory/lecture/research building to be named the IVC Brawley Lithium Research Hub / STEM Building (Academic Building II #102) located on a vacant development site on the IVC Brawley master plan. This project will provide a 43,000 ASF/66,000 GSF STEM research and instructional facility. The project will include lower division teaching labs, upper division teaching labs interdisciplinary lecture, 45 faculty/administrative offices, research and research services space, conference rooms, mechanical, electrical and telecom support spaces. Existing STEM programs at the San Diego main campus are severely impacted, and this new facility will expand access to both STEM and Engineering degrees to more students in the Imperial Valley region. To this end the facility will include 20,000 ASF of labs, core facilities with major instruments, and experimental fabrication space for collaborative work with public and private partners. - This direct construction cost budget includes the following; escalation, design contingency, furniture, fixtures & equipment; wayfinding signage; audio visual equipment. - The contract duration for the Phase 2 agreement is approximately 613 calendar days. The budget and duration will be established in the RFP. - The contract specifies that liquidated damages are $5,500 for each calendar day construction completion is late. - The Design-Builder is required to be licensed in the state of California with a B - license and registered to bid public works with the California Department of Industrial Relations (DIR). - The Design-Builder is required to be prequalified by the CSU Prequalification Program Administrator; refer to RFQ Section 4.

Under Construction

Educational

$67,000,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

62 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
92
Active Projects
51
Bidding Soon
833
All Active Projects
362
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2022

November 13, 2023

img_map_placeholder

5500 Campanile Dr, San Diego, CA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.