Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 28, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a bridge / tunnel in Dexter, Michigan. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

The 2022 Bridge Preventative Maintenance Project is located throughout Washtenaw County, Michigan. The project consists of epoxy deck overlays, concrete patching, expansion gland replacement, and pavement markings.

Bid Results

Bridges / Tunnels

$707,413.00

Public - County

Paving, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
377
Active Projects
153
Bidding Soon
2,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed