BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Montrose, Colorado. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; and sidewalk / parking lot.

The project consists of furnishing all labor, equipment, and materials necessary to complete construction of the South 3rd Plaza Construction Project in accordance with the project plans and specifications. This includes, but is not limited to, the following key tasks A. Perform removals to clear the site for construction including, but not limited to, removal of existing improvements, fencing, lighting, pavement, and concrete. B. Perform resets of select signage within the project area. C. Install new storm drain infrastructure to include inlets, piping, and channel drains. D. Install new electrical lighting to include panels, underground circuits, below-grade power supplies, parking lot lighting, pedestrian lighting, and lighting in new seat walls. E. Construct new concrete curb and gutter, valley pans/fillets, sidewalk, and curb ramps. F. Reconstruct roadway base and paving with hot mix asphalt. G. Construct a pedestrian plaza to include concrete flatwork, irrigation piping and controls, landscaping, plantings, seat walls, trash cans, benches, bicycle racks, and a flagpole. H. Install new signage and striping. I. Coordinate project surveying and stakeout. This work is to be paid directly by the City and coordinated by the contractor. J. Implement stormwater management (including preparation of a stormwater management plan and completion of a stormwater construction permit with CDPHE), traffic control (incl. traffic control plan), site security, site restoration, final grading, and quality control testing as necessary to complete the work in accordance with the project plans and specifications. Bid Bonds (5% of total bid price) and performance and payment bonds (100% of total bid price) are required on construction projects over $50,000. Question Deadline 03/06/2023 at 12:00 PM MT All questions regarding this Request for Proposal shall be directed to the individual listed above. All inquiries shall clearly identify the name of the firm and the authorized representative, the RFP number and title. The City reserves the right to accept or reject any or all proposed bids, or any combination of them, and to waive any informality or irregularity in the bid or in the bidding. The method of Contractor Selection has not been Determined at this time

Post-Bid

Sidewalks / Parking Lot

$1,973,608.00

Public - City

Paving, Site Work

17

5

2

2

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
5
Bidding Soon
114
All Active Projects
39
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 8, 2023

May 8, 2023

img_map_placeholder

To Be Determined, Montrose, CO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.