BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 8, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Montrose, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Water Treatment Plant Package (Package 1): is to be designed and constructed in three phases using the PDB delivery method: Phase 1 Design Basis: Prepare design to 30% level (Basis of Design) and submit to CDPHE for conditional approval. Phase 1 is complete when there is an agreement on all relevant design criteria, project phasing, treatment processes, appurtenances, and major items of equipment and the PDB team has produced a detailed cost model and an initial price proposal at 30%. Evaluation of construction means and methods, materials of construction, alternate construction or installation systems may occur informally during Phase 1 but should be generally reserved for Phase 2 Design and Preconstruction Services. Phase 1 Deliverables Basis of Design Report Conceptual Drawings Preliminary schedule Phase 2 Design and Preconstruction Services: Prepare design to 60% (Preliminary Design), submit application for construction approval to CDPHE, and prepare a Phase 3 Proposal. Phase 2 is completed when there is agreement on the Project schedule and a stipulated cost proposal has been accepted. Phase 2 Deliverables Required plans and specifications for CDPHE approval Stipulated cost proposal with the detailed program schedule/implementation plan, an updated risk register, and summary of key design assumptions Phase 3 services: Complete design, procurement of subcontractors and vendors, self-performance of certain elements of the construction (where permitted and at the P7WA's discretion), and full construction and commissioning. Waterline Package (Package 2): is to be designed and constructed in two phases and amended into the prime contract: P7WA's OA will prepare design documents in conjunction with completing the National Environmental Protection Act (NEPA) Environmental Assessment (EA) and acquiring easements along the pipeline corridor. P7WA's 30% waterline design package will include topographic survey tied to rights-of-way and parcel boundaries, completed property abstracts and research for impacted properties, and a final waterline alignment. P7WA intends to combine the Waterline Package (#2) into the project in one of the two ways described below. The method of Contractor Selection has not been Determined at this time.

Post-Bid

Water / Sewer

$94,000,000.00

Public - County

Paving, Site Work

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
44
Active Projects
14
Bidding Soon
181
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2022

April 10, 2023

Project location map

To Be Determined, Montrose, CO

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.