Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 13, 2022 at 8:00 PM

Updated September 14, 2023

Site work for a water / sewer project in Brighton, Colorado. Completed plans call for site work for a water / sewer project.

Description Metro Water Recovery (Metro) intends to engage a Construction Management At-Risk contractor (CMAR or Contractor) to provide preconstruction and construction services related to the NTP Effluent Temperature Project (Project) at Metro's Northern Treatment Plant (NTP) located at 51 Baseline Road in Brighton, Colorado. Contractor is expected to work collaboratively with Metro, and Metro's design engineer to optimize and better define schedule, project costs, construction impacts on stakeholders, design details and other advantages that result from use of the CMAR process. Metro will advance the understanding of the viability of single-pass cooling towers to lower the temperature of wastewater with the objective of meeting the temperature reduction requirements at NTP. Since there are currently no known wastewater facilities in cold weather climates employing this technology for effluent temperature reduction and no Water Quality Control Division (WQCD) approved design criteria, Metro can lead the industry in determining whether this is a viable solution for thermal pollution reduction in the area. If shown to be technically, environmentally, and economically feasible, the data collected during the Project will facilitate the design and construction of these cooling systems and help optimize the operation and maintenance of effluent cooling systems for NTP. The Project will include up to three work packages: Work Package 1 will consist of a technology review, conceptual design, experimental design, and demonstration system installation and testing on a secondary effluent side stream; Work Package 2 will consist of demonstration system design, construction, and testing on tertiary effluent; and Work Package 3, contingent upon the results of preceding Work Packages, will include permitting and commissioning for a permanent cooling tower system to meet CDPS compliance, and may include additional design and construction. Question Acceptance Deadline 07/15/2022 04:00 PM EDT

Post-Bid

Water / Sewer

$500,000.00

Public - County

Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

34 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
79
Bidding Soon
1,710
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2022

November 28, 2022

Project location map

51 Baseline Pl, Brighton, CO

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed