BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in North Charleston, South Carolina. Completed plans call for the construction of a 125,000-square-foot educational facility; for site work for a educational facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The work includes, but is not limited to, the construction of a new, two-story, fully sprinkled, 125,000 square foot building located on the existing Morningside Middle School campus (1999 Singley Lane, North Charleston, SC 29405). The facility will be composed predominantly of load bearing masonry veneered with utility brick and reinforced with structural steel, joists, trusses, and metal decking. The roof system is a 2-ply modified bitumen system. Mechanical system is an air-to-air direct expansion system with dedicated outdoor air units. Finishes will include but are not limited to: SVT, ceramic and quarry tile, sealed concrete flooring, carpet, acoustical ceilings, paint, casework, marker/tack boards, and kitchen equipment. The package includes an elevator, basic electrical services, life safety systems, information technology systems, and cable trays. Sitework is also part of this contract and consists of the installation of utilities, paving, sidewalks, curb & gutter, fencing, grassing and landscaping. Project will be required to be designed and constructed in accordance with CCSD's Educational Specifications and Design Requirements. The Owner has retained the services of a Program Manager, Brownstone Construction Group, to represent the Owner's interest during the construction of the work. Deadline for Receipt of Questions - November 21, 2023 Posting of Intent to Award - December 6, 2023 CCSD Board of Trustee Approval - January 22, 2024 Notice To Proceed - January 23, 2024 Access to Site - February 1, 2024 Substantial Completion (639 Calendar Days) - October 31, 2025 Final Completion (30 Calendar Days) - November 30, 2025 Contractor must have valid South Carolina Contractors License. The contractor or sub-contractor performing this work must have all required licenses, both State of South Carolina and Federal, prior to start of work. BID BOND in the amount of 5% of the bid is required.

Bid Results

Educational

$46,260,000.00

Public - County

New Construction, Paving, Site Work

1

4

92

4

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
81
Bidding Soon
922
All Active Projects
435
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

December 7, 2023

January 23, 2024

November 30, 2025

img_map_placeholder

1999 Singley Ln, North Charleston, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.