BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 30, 2022 at 8:00 PM

Updated March 25, 2025

Site work for a water / sewer project in Arroyo Grande, California. Completed plans call for site work for a water / sewer project.

Engineer's Estimated Cost: $254,000 to $254,000 Pre-Qualification for Bidders: Not Required License Type Required: Class A In general, the project includes removing and replacing an existing drainage inlet, installing a new manhole, concrete junction boxes, and new HDPE pipe within the City and Caltrans right-of-way. Connecting to an existing box culvert within the Hwy 101 right-of-way; Restoring landscaping; Providing traffic control, stormwater control, and complying with the provisions of the Caltrans Permit. Project Duration: 60 Work Days Liquidated Damages: $1,000.00 Per Calendar Day Bid Bond Percentage: 10%

Award

Water / Sewer

$238,679.00

Public - City

Site Work

22

8

8

9

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
69
Active Projects
28
Bidding Soon
492
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

September 5, 2022

Project location map

Oak Park Boulevard, Arroyo Grande, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.