Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 12, 2022 at 8:00 PM

Updated September 15, 2023

Renovation of a water / sewer project in Aurora, Missouri. Completed plans call for the renovation of a water / sewer project.

The work to be performed under this contract generally consists of replacing nine (9) valves on the peak flow pumps, replacing one (1) valve on the peak flow return line, replacement of electrical controls and lighting, and painting the piping and interior of the peak flow pump building at the Aurora, Missouri Wastewater Treatment Facility.

Award

Water / Sewer

$264,757.00

Public - City

Renovation

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
67
Bidding Soon
1,066
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 11, 2022

September 12, 2022

Project location map

Multiple Locations, Aurora, MO


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed