Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a water / sewer project in Red Bud, Illinois. Completed plans call for the renovation of a water / sewer project.
The Project Will Consist of Removal of the Existing Raw Water Aerator and Replacing It With a New Aerator in the Existing Location, Mounting and Connection of the New Aerator to the Raw Water Inlet Line and Work Specified and Required. The Existing Aerator Shall Be Kept in Service as Long as Possible Prior to Installation of the New Aerator Unit. All Proposals Must Be Accompanied by a Bid Bond on the Form Contained in the Proposal, Bank Cashier's Check, Bank Draft, or Certified Check, Payable to the City of Red Bud, for Not Less Than Five Percent (5%) of the Amount of the Bid. The City of Red Bud Reserves the Right to Accept or Reject Any or All Bids and to Waive Any Informality in Any Bid Should It Consider Same to Be in Its Best Interest. Bids May Not Be Withdrawn for a Period of Ninety (90) Days After the Bid Opening. Attention Is Called to the Fact That Not Less Than Minimum Salaries and Wages as Set Forth in the Contract Documents Must Be Paid on This Project, and That the Contractor Must Ensure That Employees and Applicants for Employment Are Not Discriminated Against Because of Their Race, Color, Religion, Sex or National Origin. Notice - Unique Entity Id / Sam Registration: Prospective Bidders (Prime/general Contractor) Have a Sam Unique Entity Id Assigned and a Complete, Active Sam Registration Prior to Contract Award (85 Fr 49523, 25.205), and Not Be Excluded From Participating in Any Federal Assistance Program (24 Cfr 85, Subpart C 85.35); and Subcontractors Must Have a Sam Unique Entity Id Assigned (85 Fr 49523, 25.300) Prior to Contract Award and Not Be Excluded From Participating in Any Federal Assistance Program (24 Cfr 85, Subpart C 85.35). Construction Contracts for a Cdbg Grant Funded Project Cannot Be Awarded Unless/until Those Conditions Are Met.
Bid Results
Water / Sewer
$172,000.00
Public - City
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 14, 2022
August 15, 2022
525 Power St, Red Bud, IL
Related To This Project
Red Bud, IL
Bid Date: Feb 21 2023
Red Bud, IL
Bid Date: Mar 06 2023
Red Bud, IL
Bid Date: Sep 11 2023
Red Bud, IL
Bid Date: Jan 26 2024
Red Bud, IL
Bid Date: Feb 17 2022
Red Bud, IL
Bid Date: Sep 08 2022
Red Bud, IL
Bid Date: Apr 03 2024
Red Bud, IL
Bid Date: Apr 04 2024
Red Bud, IL
Bid Date: Jul 11 2022
Red Bud, IL
Bid Date: Jun 08 2022
Red Bud, IL
Bid Date: Oct 27 2022
Rockford, IL
Bid Date: Sep 19 2022
Springfield, IL
Bid Date: Sep 26 2022
Riverdale, IL
--
Cicero, IL
Bid Date: May 19 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.