EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 20, 2022 at 8:00 PM

Updated October 1, 2024

Renovation of a transportation facility in Montoursville, Pennsylvania. Completed plans call for the renovation of a transportation facility.

The project specific goal been established as 0.84% for Disadvantaged Business Enterprises. Notice Text INVITATION TO BID Williamsport Municipal Airport Authority Williamsport Regional Airport NOTICE IS HEREBY GIVEN, that the Williamsport Municipal Airport Authority will receive proposals for Contract 2022-C-L-03 until 5:00 PM on July 14, 2022. The proposals will be publicly opened and read aloud at 5:30 PM the same day on July 14, 2022, at the Airport Conference Room 724 Airport Road, Montoursville, PA 17754. Contract 2022-C-L-03 includes: Airport Control Tower Renovations. A non-mandatory Pre-bid Meeting will be held on July 6, 2022; 10:00 AM at Airport Conference Room 724 Airport Road Montoursville, PA 17754. The drawings, specifications and other contract documents are on file and open to the public for inspection during normal business hours at the office of the OWNER, Williamsport Municipal Airport Authority, 724 Airport Road, Suite A106 Montoursville, PA 17754. The prospective Bidder is encouraged to contact Richard Howell for review of documents at 570-368-2444 for information on where the documents are located within their office and any special procedures for accessing the documents. These documents are also available for review at the office of the ENGINEER, CDI Architects Group LLC dba L.R. Kimball - Architecture and Engineering, 615 West Highland Avenue Ebensburg, PA 15931, Telephone: 814-472-7700. Contract documents, proposal forms and drawings may be obtained from the ENGINEER, Upon request, electronic plan sets are free of charge. All inquiries should be directed to the Project Manager, Vince DeCario, PE at 814-472-7700 or via email at vjdecario@transystems.com. Bids shall be prepared and submitted on the prescribed forms in accordance with instructions contained in the Instructions to Bidders and General Provisions (Section 20) Divisions of the Project Manual. The Williamsport Municipal Airport Authority expressly reserves the right to accept or reject any or all bids or to waive any informalities in the same. Each bidder must deposit with his/her proposal a bid security in an amount equal to at least 10%. Said security shall be in the form and subject to the conditions given in Section 20 of the General Provisions. No bidder may withdraw his/her bid within 120 days after the actual date of the opening thereof. Successful bidders, must enter into the Agreement and furnish a Contract Bond and evidence of required insurance with fifteen (15) days after notification acceptance of such proposals, all as more specifically required in the Contract Documents. Wages as predetermined by the US Secretary of Labor and Industry and included in the specifications and contract documents and/or addenda thereto shall be used by the CONTRACTOR in paying labor in connection with the work under this contract. All work under this contract shall be subject to the regulations contained in Division 8 of the Project Manual. The Williamsport Municipal Airport Authority, in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d 4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 26, Nondiscrimination in Federally assisted programs of the Department of Transportation, issued pursuant to such Act, hereby notifies all bidders that it will affirmatively insure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, or national origin in consideration for an award. The Williamsport Municipal Airport Authority is committed to assuring that small business concerns owned and controlled by socially and Economically Disadvantaged Individuals (DBE) are included in projects it sponsors. The project specific goal been established as 0.84% for Disadvantaged Business Enterprises. The Williamsport Municipal Airport Authority is committed to meeting this goal on all services provided, and the CONTRACTOR is expected to put every effort forward to meet the above DBE goal. Proposals must include the percentage involvement of Disadvantaged Business Enterprises along with the names of the firms involved, and the completed certification. Please note that certification as a DBE by the PA UCP is separate and distinct from other certification programs. The only source that should be used for verification of current eligibility of a DBE Firm is the PA UCP website at www.paucp.com. Physical certification letters and/or expiration dates should not be requested from DBE Firms.

Post-Bid

Transportation Terminals

$900,000.00

Public - City

Renovation

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Access to Site, Price and Payment Procedures, Value Analysis, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Quality Control, Contractor Quality Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Bonds, Warranties
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Site Remediation
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies, Stone Masonry, Manufactured Masonry, Cast Stone Masonry
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Thermal Insulation, Air Barriers, Joint Protection, Preformed Joint Seals, Backer Rods
Division 08 - Openings

Division 08 - Openings

Openings, Entrances and Storefronts, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Lath, Metal Lath, Portland Cement Plastering, Ceilings, Flooring, Resilient Flooring, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Exterior Specialties, Protective Covers
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Residential Furniture, Beds, Multiple Seating, Pews and Benches, Benches
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Planting Preparation, Turf and Grasses, Sodding, Planting Accessories, Tree Grates
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Lifting Devices, Lifts, Mobile Plant Equipment, General Vehicles, Maintenance Vehicles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
123
Active Projects
71
Bidding Soon
852
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 14, 2022

August 15, 2022

img_map_placeholder

724 Airport Rd, Montoursville, PA

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Williamsport Airport Control Tower Renovations

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.