BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Berkeley Lake, Georgia. Completed plans call for site work for a water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

CITY OF BERKELEY LAKE BERKELEY LAKE, GA 2023 ARPA STORMWATER IMPROVEMENTS City of Berkeley Lake (Owner) is requesting Bids for the construction of the following Project: 2023 ARPA Stormwater Improvements The Project includes the following Work: The Project consists of stormwater drainage improvements, including stormwater system repairs, trenchless stormwater pipe repair, rip rap installation and maintenance, erosion/sediment control measures, shoulder grading, curb & gutter installation, asphalt paving, and labor and materials necessary to install the authorized work. Bid security shall be furnished in accordance with the Instructions to Bidders. Bid security shall be submitted with each bid in the amount of 5 percent of the total bid amount. No bid may be withdrawn for a period of 60 calendar days after opening of bids. Owner reserves the right to reject any and all bids and to waive informalities and irregularities. No proposal will be considered unless it is accompanied by satisfactory evidence that the Bidder holds either a Georgia State Contractor's License, Georgia State Utility Contractor's License, or qualifications with the Georgia Department of Transportation for similar work, in compliance with Act. O.C.G.A. 43 14 and 43-41. Failure to provide the bidder's license or qualification number on the outside of the sealed proposal will result in rejection of the bid. If the Contract is to be awarded, Owner will award the Contract on the basis of the base bid alone. Successful bidder shall begin the Work on receipt of the Notice to Proceed and shall complete the Work within the Contract Time of 90 calendar days. Owner shall make progress payments on account of the Contract Price on the basis of Contractor's Applications for Payment submitted once per month as provided in the General Conditions. Bidder must make positive efforts to use small and minority owned businesses. Questions by email should be sent to bidquestions@keckwood.com and should include company name, contact name, email address, and phone number

Post-Bid

Water / Sewer

$700,000.00

Public - City

Paving, Site Work

24

11

6

2

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
17
Bidding Soon
1,448
All Active Projects
485
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 26, 2023

October 26, 2023

img_map_placeholder

Multiple Locations, Berkeley Lake, GA

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.