BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Morrow, Georgia. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Awarded to RM Construction *As of February 24, 2023, one addendum has been issued for this project. Please contact the owner directly for details.* For questions, please email jbaker@cityofmorrow.com. The scope of work for this contract includes the design, engineering, supervision, labor, materials, and equipment necessary for the repair and refurbishment of this structure as described within this RFP. One (1) Vehicular Bridge Repairs and Maintenance Refurbishment: 44’ Overall Width x 365’ Long Repetitive Span Bridge 32’ Wide (30’ Clear) Vehicular Section (2) 6’ Wide (5’ Clear) Pedestrian Sections Bridge Repairs & Maintenance Description Scope includes fastener tightening, rail straightening, sanding/grinding of joints. Scope includes repairs utilizing treated dimensional wood and all treated timber framework including: · Remove and replace (1) wingwall piling shim. · Install marine grade pile wraps on (2) pile bents in/near crossing. · Sand pile gouges/large checking. · Remove and replace (100) vehicular wear deck boards using 2x8 Southern Yellow Pine materials to be glued and fastened to subdeck. · Remove and replace (40) pedestrian deck boards using 3x8 Southern Yellow Pine materials. · Remove and replace (1) 6x10 curb using Southern Yellow Pine materials. · Remove and replace (45) 4x4x50” vehicular guiderail vertical pickets using Southern Yellow Pine materials. · Remove and replace (40) 4x4x54” vehicular guiderail vertical pickets using Southern Yellow Pine materials. · Remove and replace (3) 2x8 vehicular upper rails using Southern Yellow Pine materials. · Remove and replace (4) 4x10 pedestrian rail posts using Southern Yellow Pine materials. · Remove and replace (2) 2x6 pedestrian lower rails using Southern Yellow Pine materials. · Remove and replace (15) 2x4 pedestrian vertical pickets using Southern Yellow Pine materials. · Additional repairs of concealed/non-visible bridge components may arise after the removal of existing elements for the repairs listed above. In the event of additional repairs.

Award

Bridges / Tunnels

$200,000.00

Public - City

Paving, Site Work

8

3

4

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
132
Active Projects
69
Bidding Soon
1,349
All Active Projects
477
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

February 24, 2023

March 20, 2023

img_map_placeholder

To Be Determined, Morrow, GA

New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.