Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of an educational facility in Richmond, Virginia. Completed plans call for the construction of a 40,000-square-foot, two-story above grade educational facility.
Expanded ACE Center at Hermitage High School – HCPS opened the first floor of the new stand-alone 85,000-square-foot ACE Center at Hermitage High this past January but is currently constructing the building’s second floor, which will open during the 2026-2027 school year. The 40,000-square-foot second floor will host a number of Henrico Career & Technical Education health and medical programs for CTE students across the county. CTE construction students get the opportunity to work alongside contractors to help build the second floor. With both floors constructed, the Hermitage ACE Center will be able to seat 1,300 students and the project will cost a total of $33 million, using funds from the Capital Improvement Plan. ----------------------------------- PLAN OF DEVELOPMENT AND LIGHTING PLAN POD2022-00177 Hermitage High School -ACE Center - 8350 Hermitage High Blvd Approved by Director on 05/25/2022 Timmons Group for Henrico County Public Schools and the County of Henrico: Request for approval of a plan of development and lighting plan, as required by Chapter 24, Section 24-2314 of the Henrico County Code, to construct a two-story building, with a first floor of 40,936 square feet and a second floor of 31,636 square feet, on the existing Hermitage High School campus. The 14.30-acre portion of the 58.94-acre site is located on the east line of Hungary Spring Road, approximately 750 feet north of Parham Road, on parcels 767-754-5387 and 767-755-9952 (part). The zoning is R-3 One Family Residence District. County water and sewer. (Brookland) This project proposes construction of a two-story Advanced Career Education (ACE) building on the existing Hermitage High School campus, located on Henrico County owned property. The first floor of the building is approximately 41,000 square feet, with an approximately 32,000 square foot second floor shell space to be finished by the students enrolled in the ACE program. There is currently an ACE program at Hermitage High School, but this expansion will allow the addition of new programs such as video production within the video production studio proposed with the new building, as well as accommodate additional students in the existing programs. The project will also include upgrades to the 50-year-old existing ACE center for cosmetic and mechanical improvements
Under Construction
Educational
$33,000,000.00
Public - City
New Construction, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 29, 2024
8350 Hermitage High Blvd, Richmond, VA
Related To This Project
Richmond, VA
Bid Date: Aug 27 2024
Richmond, VA
--
Richmond, VA
Bid Date: Sep 26 2024
Richmond, VA
Bid Date: Aug 16 2024
Richmond, VA
--
Richmond, VA
--
Richmond, VA
Bid Date: Oct 01 2024
Richmond, VA
Bid Date: Aug 20 2024
Richmond, VA
Bid Date: Aug 26 2024
Richmond, VA
Bid Date: Aug 09 2024
Richmond, VA
Bid Date: Sep 19 2024
Richmond, VA
--
Richmond, VA
Bid Date: Sep 12 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.