Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 12, 2022 at 8:00 PM

Updated July 19, 2024

Site work and paving for a mixed-use development in Seattle, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

This Project consists of the following elements of Work: Abandon in-place existing watermains; install new ductile iron watermain pipe, including valving, fire hydrants, and other watermain appurtenances, ranging from 6 inch to 8 inch in diameter by open-trench method: storm & sewer improvements; assist SPU Water Operations with: cut, cap, blocking of existing watermains, temporary and permanent water main connections, and temporary and permanent water services connection transfers; and final surface restoration of roadway and landscaping, including ADA. curb ramp improvements. This Project is a Covered Project subject to the City of Seattle's Community Workforce Agreement (CWA) and Priority Hire SMC 20.37. With the support of the mayor and City Council, the City of Seattle administers programs that support racial and economic equity through contracting, Priority Hire is one of these programs. Priority Hire provides people living in economically distressed communities, women, and people of color access to work on the city's construction projects No Bid will be accepted from any Bidder who does not attend at least 1 ofthe mandatory meetings This Project is located at nine different sites in Seattle and at one site in the City ofShoreline: 1) N 43rd St from Meridian Ave N to Bagley Ave N; 2) E Olive St from 31st Ave E to 32nd Ave; 3) E Spring St from 14th Ave to 16th Ave: 4) E Marion St from 14th Ave to 15th Ave; 5) E Columbia St from 14th Ave to 16th Ave; 6) 57th Ave SW from SW Stevens to SW Winthrop St; and 7) 48th Ave S from S Othello St to S Austin St; 8) S Pearl St from Corson Ave S to 12th Ave S; 9) SW 98th St from 50th Ave SW to 51st Ave SW; and 10) N 148th St from Meridian Ave N to Corliss Ave N (City of Shoreline). For purposes ofthe Inclusion Plan, this is considered a "UNDERGROUND" type of project with a Past Performance of 17% WMBE utilization rates based, on completed projects. For questions on the Inclusion Plan please contact Miguel Beltran at Miguel, beltran@seattle.gov or 206-684- 4525. Back-up contact is Carmen Kucinski at carmen.kucinski@ seattle.g.ov or 206-684-0188. Questions must be submitted no later than 5:00 p.m. 3 Business Days before the Bid Opening Date. Only written questions will be accepted for this project. Please submit your questions to Kai Fan at kai.fan(R) seatUmgov.

Bid Results

Water / Sewer

$5,249,995.00

Public - City

Paving, Site Work

85

24

8

9

Subscribe For Documents

45 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
108
Bidding Soon
2,052
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed