Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Create your *free account*
Fill in a few details to keep viewing projects.
You've used your *free project views*
Register today to keep viewing commercial construction projects bidding in your area.
With ConstructConnect Project Intelligence, you can:
- Filter 825,000+ active commercial projects down to the ones that fit your trade and area
- Reach the right people with contact info for 575,000+ construction companies
- See who's bidding before you put in the hours
- Get daily email updates and alerts on the projects you're watching
Published September 14, 2022 at 8:00 PM
Updated November 15, 2023
Site work for a sidewalk / parking lot in Delta, British Columbia. Completed plans call for site work for a sidewalk / parking lot.
Site 1-5: Ladner Trunk Road (Central Avenue, Trenant Park Square, 52A Street SE and NW corners, 53 Street) The work generally consists of saw cutting existing concrete and asphalt, excavating material, and installing no-lip letdowns, concrete curbs and sidewalk as per Delta Standard Drawing L2.32. The work also includes reinstating asphalt with 100mm thick granular base and 1 lift of 100mm thick asphalt. Site 6: 112 Street at 74A Avenue The work generally consists of excavation and disposal of topsoil, installation of a 9m x 3m concrete pad per MMCD C2. Importing 150mm thick replacement topsoil and sod. Work at this location also includes removal and relocation of landscape tie. Site 7: Milson Wynd at 52 Street The work generally consists of excavation and disposal of topsoil, installation of a 9m x 3m concrete pad per MMCD C3. Importing 150mm thick replacement topsoil and sod. Site 8: 52A Street at 4 Avenue The work generally consists of excavation and disposal of topsoil, installation of a 9m x 3m concrete pad per MMCD C2. The work also includes installing a 1.5m sidewalk to connect with existing letdown and driveway, importing 150mm thick replacement topsoil and sod, removing and relocating existing fence and irrigation system. Site 9: NB 52A Street at 3 Avenue The work generally consists of excavation and disposal of topsoil, installation of a 9m x 3m concrete pad per MMCD C3. Importing 150mm thick replacement topsoil and sod. Award is subject to final approval. OTHER BID: Critial Path Enterprises Ltd - Konrex $176,730
Award
Sidewalks / Parking Lot
$141,850.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Always Free
- Use filters and keyword searches to find valuable projects
- Get promoted to General Contractors and receive ITBs
- Access limited project details, bid dates, and locations
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 25, 2022
August 8, 2022
Multiple Locations, Delta, BC
Related To This Project
Delta, BC
Bid Date: Aug 26 2022
Delta, BC
Bid Date: Aug 29 2022
Delta, BC
Bid Date: Mar 02 2022
Delta, BC
Bid Date: Oct 16 2023
Delta, BC
Bid Date: Sep 22 2023
Delta, BC
Bid Date: Oct 12 2023
Delta, BC
--
Delta, BC
Bid Date: May 04 2022
Delta, BC
Bid Date: May 04 2022
Delta, BC
--
Delta, BC
Bid Date: Feb 16 2022
Delta, BC
Bid Date: Feb 17 2022
Delta, BC
Bid Date: Mar 07 2022
Unlock the Full Project List
Access every active project near you — get started today.
- 825,000+ active commercial projects tracked daily
- Verified contact info for the GC, owner, and architect
- New leads delivered to your inbox every morning
Create your account to get started.
Takes less than a minute — no credit card needed