BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Anaheim, California. Conceptual plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As part of an ongoing effort to enhance safety near schools, the Public Works Department applied for and received ATP grant funding to construct new sidewalks around various parts of the city. The City of Anaheim is the lead agency for the design, right-of-way, and construction phases of the Project. The City has completed the PAED phase. All phases of this project are Federally Funded. City Staff conducted an arterial sidewalk and curb ramp survey to identify all remaining sidewalk gaps on the arterial street. The survey revealed five locations with missing sidewalk segments located within one-half mile of school entrances (public or private) where pedestrians must walk on the street, across either lawns, dirt, or uneven segments of private property or cross the road to reach their destinations. Four of five public schools impacted by these sidewalk gaps are located in disadvantaged communities. The Project will construct over 6,500 linear feet of ADA accessible sidewalk near nine schools (five public and four private), closing sidewalk gaps located within one-half mile of a school entrance and re-construction of ADA compliant driveways along the following street segments: Acacia Street, La Palma Avenue, Frontera Street, and Santa Ana Canyon Road. The City of Anaheim is soliciting proposals from qualified professional civil engineering consulting firms to provide the following services, as necessary but not limited to: Project Management and Coordination Preliminary Data Acquisition - Records Research, Utilities and Potholing Survey - Santa Ana Canyon Road Technical Studies/Reports Project Precise Alignment Final Plans, Specifications and Estimates (PS&E) Bid & Construction Support Upon completion of the Project, residents will have safe and continuous sidewalks for their children traveling one-half mile or less to school. The Project will also connect residences (including very high-density, disadvantaged communities) to other destinations such as retail locations, service providers, churches, and transit areas. Online Q&A : Yes Q&A Deadline : 07/25/2022 5:00 PM (PDT)

Conceptual

Sidewalks / Parking Lot

$280,000.00

Public - City

Paving, Site Work

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
220
Active Projects
128
Bidding Soon
2,296
All Active Projects
1,055
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 31, 2023

img_map_placeholder

Multiple Locations, Anaheim, CA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.