EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published March 10, 2023 at 7:00 PM

Updated January 26, 2024

Site work and paving for a mixed-use development in Maywood, Illinois. Completed plans call for site work for a road / highway; sidewalk / parking lot; water / sewer project; for paving for a road / highway; sidewalk / parking lot; and water / sewer project.

the President and Board of Trustees of the Village of Maywood, Cook County, Illinois, that sealed bid proposals will be received for the following improvement: 2022 ROADWAY IMPROVEMENTS PROJECT This project consists of roadway, sewer, and water main improvements at various locations within the Village of Maywood. The work to be performed will include the installation of approximately 480 feet of 8" ductile iron water main and appurtenances; connection of water mains and installation of water services; sewer televising and sewer lining of approximately 600 feet of combined sewer using the inversion method; replacement or repair of defective drainage structures; replacement of deteriorated storm sewer laterals and certain sections of combined sewer; removal and replacement of curb and gutter, sidewalks, and driveway pavement; excavation of the existing pavement; installation of an aggregate base course; installation of concrete alley pavement; reconstruction of pavements with hot-mix asphalt binder and hot-mix asphalt surface courses; milling and resurfacing of hot-mix asphalt pavements; pavement markings and signage; landscaping restoration of the parkways, and other related work. The Engineer has been authorized to refuse to issue plans, specifications, and proposals to any person, firm, or corporation that he considers to be unqualified. Proposals must be submitted on the forms provided. All bidders wishing to obtain bidding documents must be approved by the Village prior to obtaining bidding documents. All bidders must provide proof that they are prequalified with the Illinois Department of Transportation to perform at least 50% of the value of the work before being issued bidding documents. No bid shall be withdrawn after the opening of the Proposals without the consent of the President and Board of Trustees of the Village of Maywood for a period forty-five (45) days after the scheduled time of bid opening. The Contractor and Subcontractor shall comply with all regulations issued pursuant to Prevailing Wage Act (820 ILCS 130), and other applicable Federal Laws and regulations pertaining to labor standards. Bidders shall adhere to certain Disadvantaged Business Enterprise (DBE) bid submittal requirements and observe the stated DBE goals as described within the contract documents. The successful bidder for the work will be required to furnish sufficient insurance to the Village of Maywood and the Engineer against all damage claims that might arise due to the negligence of the Contractor and will be required to furnish a Performance Bond and a Labor and Material Payment Bond in the amount of the contract. The Village of Maywood reserves the right in receiving these bids to waive technicalities and reject any or all bids. This project will consist of improvements to the following sections of street: Roadway Limits Wilcox Street 21 st Avenue to 19 th Avenue 8th Avenue Green Street to Madison Street8 th Avenue Madison Street to School Street School Street 3rd Avenue to 1st Avenue 3rd Avenue Madison Street to School Street 2nd Avenue South Terminus to School Street Erie Street 3rd Avenue to 2 nd Avenue The work to be performed will include the installation of approximately 480 feet of 8" ductile iron water main and appurtenances; connection of water mains and installation of water services; sewer televising and sewer lining of approximately 600 feet of combined sewer using the inversion method; replacement or repair of defective drainage structures; replacement of deteriorated storm sewer laterals and certain sections of combined sewer; removal and replacement of curb and gutter, sidewalks, and driveway pavement; excavation of the existing pavement; installation of an aggregate base course; installation of concrete alley pavement; reconstruction of pavements with hot-mix asphalt binder and hot-mix asphalt surface courses; milling and resurfacing of hot-mix asphalt pavements; pavement markings and signage; landscaping restoration of the parkways; and other related work

Award

Water / Sewer

$1,752,498.00

Public - City

Paving, Site Work

22

6

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management
Division 03 - Concrete

Division 03 - Concrete

Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Stone Assemblies
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Watering, Bases, Ballasts, and Paving, Unit Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Site Improvements, Fences and Gates, Planting, Turf and Grasses, Sodding
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
169
Active Projects
89
Bidding Soon
2,253
All Active Projects
965
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 21, 2022

April 25, 2023

img_map_placeholder

Multiple Locations, Maywood, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

2022 Roadway Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.