BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Butte, Nebraska. Completed plans call for site work for a bridge / tunnel.

The work shall include all labor, materials, transportation and equipment required for the construction of: Sta. 7+46 Extend 72" x 119' Corrugated Metal Culvert Pipe Extension w/Broken Back Proposals must be signed and submitted on the forms furnished with the Bid Documents. PLEASE ONLY SUBMIT DIVISION 5. Each bidder will be required to submit with his proposal a Bid Bond or Certified Check made payable, without condition, to the County Treasurer of Boyd County, Nebraska, in an amount equal to five (5) percent of his proposal. The bidder to whom the contract is awarded shall furnish within ten (10) days after the award a surety bond or bonds in a sum equal to the full amount of the contract. The form of the bonds and surety shall be acceptable to the Boyd County Board of Supervisors. The bidder will include an estimated time of beginning and completion for the project with the proposal. The Contractor will be allowed 30 calendar days for completion. The required completion date of the project is September 27, 2022. The Board of County Supervisors reserves the right to reject any and all bids and to waive any irregularities. The Boyd County Board of Supervisors will, at their discretion, award the contract based on the lowest or best bid.

Award

Bridges / Tunnels

$96,647.00

Public - County

Site Work

15

7

4

6

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
7
Active Projects
6
Bidding Soon
59
All Active Projects
30
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 26, 2022

August 25, 2022

img_map_placeholder

Multiple Locations, Butte, NE

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.