Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Salem, Virginia. Conceptual plans call for site work for a bridge / tunnel; and water / sewer project.
The Shenandoah Tunnel Diversion is the second phase of a project to divert stormwater flows around a portion of downtown and reduce flooding on streets in the downtown area. For this phase of the project, a diversion tunnel is proposed that will tie into the existing Trout Run Tunnel (54x156 reinforced concrete box culvert) near the intersection of Shenandoah Avenue NW and Central Avenue NW, to divert runoff along Shenandoah Avenue to the N. Jefferson Street intersection with a 6H x 12W reinforced concrete box culvert. The diversion tunnel will then tie into the existing 8H x 10W tunnel that was previously used by the Hotel Roanoke to provide pedestrian access downtown, below the Norfolk Southern railroad tracks. Improved maintenance access will be established into the existing pedestrian tunnel near the corner of Shenandoah Avenue and N. Jefferson Street. The existing pedestrian tunnel will then be connected to the existing 6H x 12W corrugated aluminum arch tunnel on Norfolk Avenue by extending the existing tunnel south to build a connection over the arch pipe in a junction box on the existing Norfolk Tunnel. Laterals along Shenandoah Avenue will be connected to the new tunnel with improved drainage inlets. This project is in included in the City of Roanoke FY 2023-2027 Capital Improvement Plan (CIP). As of July 08, 2022, further details regarding design and construction have not been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Bridges / Tunnels
$4,600,000.00
Public - City
Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 1, 2027
Shenandoah Ave, Salem, VA
Related To This Project
Salem, VA
Bid Date: May 03 2022
Salem, VA
Bid Date: Jun 01 2022
Salem, VA
--
Salem, VA
Bid Date: Jul 19 2022
Salem, VA
Bid Date: May 11 2023
Salem, VA
Bid Date: Jun 01 2022
Salem, VA
Bid Date: Jul 25 2022
Salem, VA
Bid Date: May 09 2022
Salem, VA
Bid Date: Jun 30 2022
Salem, VA
Bid Date: Sep 10 2019
Salem, VA
Bid Date: Jun 23 2022
Salem, VA
Bid Date: Jun 23 2022
Salem, VA
Bid Date: Jun 27 2022
Salem, VA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.