BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a transportation facility in King Salmon, Alaska. Conceptual plans call for the construction of a transportation facility; and for site work for a transportation facility.

The Contractor shall provide professional Architectural and Engineering Services for the design of a heated, 4-bay Snow Removal Equipment Building (SREB) at King Salmon Airport (AKN). Concept plan for building suggests that it is approximately 140 long x 100 feet deep with a concrete slab foundation. Each bay will be a pull-through with 30 wide doors at each end. Building will be connected to existing airport building. Services are anticipated to include: Civil, Structural, Mechanical, Electrical, and Geotechnical Engineering, Architecture, Surveying, Environmental, Cost Estimating, and assistance during Bidding and Construction. Estimated range (US$): 500,000 to 1,000,000 Plans room: Central Estimated period for performance of the Agreement is approximately September 2022 to December 2026. Cost of these professional services is expected to be between $500,000 and $1,000,000. The Request for Proposals (RFP) Package will be available July 7, 2022 and may be obtained in person from the DOT&PF plans room at 4111 Aviation Avenue in Anchorage, AK. Persons residing outside the Municipality may obtain an RFP Package through the mail by telephoning (907) 269-0408. Proposals must conform to the RFP and be submitted with specified forms. Individuals with disabilities, including the hearing impaired, who may need auxiliary aids, services, and/or special modifications to submit a proposal should contact the TTD number: (907) 269-0473, no later than one week prior to the submittal date to make any necessary arrangements. A downloadable version of the RFP package will be available at online. AKDOT - RFP Design - King Salmon Airport Snow Removal Equipment Building (SREB) Design Services

Conceptual

Transportation Terminals

$1,000,000.00

Public - State/Provincial

New Construction, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
1
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2023

img_map_placeholder

1 King Salmon Airport Rd, King Salmon, AK

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.