BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a civil project in El Paso, Texas. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The work under this contract shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following work: The Project scope and summary includes the structural repair of existing reinforced concrete elements such as concrete beams, slabs, and columns inside the Sunset Reservoir No.1. The repairs include sealing of cracks through various methods such as crack routing and sealing depending on the location (overhead, vertical or horizontal) and the widths. The repairs also include the patching of minor to moderate spalls with and without exposed reinforcement. Additionally, expansion joints and non-moving joints along the roof and floor of the reservoir will be replaced. The repaired surfaces of the top slab will be coated with a UV resistant coating. The inside of the reservoir as well as the main concrete beams, walls and roof slab soffit will receive the installation of carbon fiber laminates (FRP). The concrete columns and stairs will be coated. The reservoir will be disinfected prior to filling it up. Contractor shall follow confined space requirements as specified in Section 00800, Article 1. The Work at the Sunset Reservoir No.1 will include but not be limited to the following: Approximately 1,370 linear feet of Concrete Repairs such as sealing cracks up to 1/4 in width in concrete walls, and approximately 2,480 linear feet in slabs and in horizontal and overhead surfaces complete in place including all materials, tools, labor, and surface preparation. Approximately 100 linear feet of Crack injection in concrete walls and slabs complete in place including all materials, tools, labor, incidentals, and surface preparations. Approximately 500 square feet of Repair of spalls on vertical and horizontal surfaces of concrete with and without exposed reinforcement complete in place including all materials, labor, tools, incidentals, and surface preparation. Approximately 200 linear feet of concrete spall repairs with exposed reinforcement in the top and bottom slab of the reservoir complete in place including all materials, tools, labor, incidentals, and surface preparation. Replacing approximately 1360 linear feet of existing expansion joints at the reservoir slabs and walls complete in place including all materials, tools, labor, incidentals, and surface preparation. Replacing approximately 2,500 linear feet of existing floor joints at slabs complete in place including all materials, tools, labor, incidentals, and surface preparation. Approximately 88,100 square feet of application of carbon fiber reinforced polymer (CFRP) on concrete structural members such as concrete walls, floors, slabs, and concrete beams as shown on the drawings and specified herein complete in place including all materials, labor, tools, and incidentals. Approximately 28,220 square feet of Ultraviolet resistant coating over carbon fiber reinforced polymer along the exterior top roof slab including all materials, labor, tools, and incidentals including surface preparation. Replacing existing steel pedestrian handrail at the tank entrance stairs with new steel rail coated with NSF61 approved coating including all components and appurtenances, labor, tools, materials, and incidentals. Cleaning and coating existing steel bearing plates with NSF61 approved coating including all components and appurtenances, labor, tools, materials, and incidentals. Cleaning and coating existing concrete columns and stairs with NSF61 approved coating after concrete repairs have been completed, including all components and appurtenances, labor, tools, materials, and incidentals. Disinfecting and testing interior of reservoir including all components and appurtenances, labor, tools, materials, and incidentals. The Successful Bidder states he or she must furnish a 100 percent (100%) Performance Bond and a 100 percent (100%) Payment Bond, in accordance with the Instructions to Bidders and the General Conditions. Wages paid on this project shall be not less than the minimum prevailing wage rates listed in the Contract Documents, Section 00840, General Wage Requirements. Questions shall be submitted before 5:00 P.M. (MST). on July 25, 2022. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The range for this project is $4,667,846.40 - $5,316,158.40

Post-Bid

Water / Sewer

$5,316,158.00

Public - City

Renovation, Site Work

20

18

12

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
29
Active Projects
17
Bidding Soon
407
All Active Projects
153
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 4, 2022

October 3, 2022

May 31, 2023

img_map_placeholder

To Be Determined, El Paso, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.