BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 21, 2022 at 8:00 PM

Updated February 13, 2024

Renovation of an educational facility in Saint Paul, Minnesota. Completed plans call for the renovation of a educational facility.

The Highland Park Middle School two phase project will begin construction June 12, 2023, and continue through August 16, 2024 to improve the building's ventilation system. Existing classroom unit ventilators and finned tube radiation, throughout the three-story classroom tower, will be removed and replaced with an overhead dedicated outdoor air system and new finned tube radiation. Existing building structure will be reinforced to support the three mechanical rooftop units providing fresh air to the building. Ventilation will be distributed through duct mains and branches installed within the building ceiling space. These ceilings will be demolished and replaced at their current elevation. New lighting will be installed at the new ceiling locations. Lighting and ventilation controls will be updated with the installation of equipment. B. The three-story classroom tower is currently heated by steam fed from the buildings heating plant. All existing steam fed equipment will be removed and replaced with hot water heating elements. To support this, a steam to hot water heat exchanger system will be implemented, and distribution piping installed throughout. Finned tube radiation has been designed to meet the heating demand of the building the spaces in which it is served. Architectural revisions to casework have been specified to support the mechanical design and meet the building requirements. Variable air volume boxes with reheat coils are proposed for space control and heating redundancy. At the end of the project, all steam and pneumatic equipment will be replaced by hot water and DDC systems. Bid-Result : WORK SCOPE: 01A - General Trades Mesinsinger Construction Company, Inc $ 735,000.00 WORK SCOPE: 05A - Structural Steel (Supply Only) Tru-Steel LLC $ 109,000.00 WORK SCOPE: 05B - Steel Erection Bald Eagle Erectors $ 71,300.00 WORK SCOPE: 09A - Gypsum Board Assemblies Frida Drywall Systems, LLC $ 88,129.00 WORK SCOPE: 09C - Acoustical Ceiling Tile Twin City Acoustics Inc. $ 230,151.00 WORK SCOPE: 09I - Painting Steinbrecher Painting Company $ 62,900.00 WORK SCOPE: 21A - Fire Protection Nasseff Mechanical $ 80,640.00 WORK SCOPE: 23A - HVAC General Sheet Meta Company, LLC $2,494,860.00 26A - Electrical & Low Voltage Gunnar Electric, Inc : $ 442,140.00

Bid Results

Educational

$4,216,020.00

Public - City

Renovation

41

22

32

4

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
236
Active Projects
148
Bidding Soon
1,568
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2022

June 12, 2023

Project location map

975 Snelling Ave S, Saint Paul, MN

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.